Skip to main content

Spencer Group cable access for Pattullo Bridge

Spencer is working on behalf of Fraser Crossing Constructors GP - a joint venture between Acciona and Aecon - on the suspension bridge near Vancouver, Canada.
By David Arminas July 3, 2023 Read time: 3 mins
The existing bridge will remain in use until the new bridge is open to traffic in 2024 but then will be removed (image courtesy Spencer Group)

UK bridge works specialist Spencer Group has been appointed to create an access system for inspecting stay cables on the new Pattullo Bridge in Canada.

The new bridge is a replacement bridge across the Fraser River near Vancouver, British Columbia connecting the municipalities of Surrey and New Westminster. The new Pattullo Bridge will take over from the existing bridge of the same name be used by drivers, cyclists and pedestrians when it opens in 2024. The existing bridge was opened in 1937 but now ceases to meet modern design standards.

Working on behalf of Fraser Crossing Constructors GP - a 50/50 joint venture between Acciona and Aecon - Spencer Group is designing, manufacturing, testing and commissioning a semi-permanent access system to enable maintenance engineers to inspect all elements of the bridge’s stay cables.

The cradle element, which transports personnel to the desired inspection location, operates similarly to a cable car, moving up and down a track rope on what will be a four lane, toll-free bridge. The cradle will be electrically hoisted up and down the main track rope. It will also vertically move up and down to enable personnel to inspect the stay cable wires throughout the lifespan of the bridge.

Gordon Neilson, principal engineer at Spencer Group and an expert in bridge gantry design, is behind the design for what is being called “The Pattullo Bridge cable fan access system”. Design work is set to be complete by the end of the summer. Manufacturing and testing will take place in the UK before the entire access system is then shipped to Canada for installation.

Fraser Crossing Constructors GP will be designing the bridge to interface with the stay cable access system, before it is tested and commissioned by Spencer Group.

The cradle will be electrically hoisted up and down the main track rope and it will also move up and down to enable personnel to inspect the stay cable wires (image courtesy Spencer Group)
The cradle will be electrically hoisted up and down the main track rope and it will also move up and down to enable personnel to inspect the stay cable wires (image courtesy Spencer Group)

Steven Bunting, project director at Spencer Group, is leading the project and coordinating the various stages of the design and build. “Our unique design on this project will be transferable to other cable stay bridges all over the world. It addresses challenges faced with the need to carry out tactile inspections of cables from a dedicated work platform, at difficult to reach locations at significant elevations,” said Bunting.

The new bridge will provide a safer crossing for bridge users with modern, wider lanes, separated by a centre barrier, dedicated walking and cycling lanes separated from traffic by a barrier on both sides of the bridge.

The bridge was originally to be opened in 2023, but the province decided to push back the opening to 2024 because of the Covid pandemic which disrupted supply lines and work schedules. The existing bridge will remain in use until the new bridge is open to traffic in 2024 but then will be removed.

Transportation Investment Corporation, a provincial Canadian Crown corporation, is delivering and overseeing this CAN$1.377 billion (US$1.05 billion) project. Fraser Crossing Partners is designing and building the new bridge. The province of British Columbia will own and maintain the new bridge when complete.

Spencer Group has carried out maintenance and repair work on some of the UK’s most iconic bridges. This includes major refurbishment on the Menai Suspension Bridge across the Menai Strait between the island of Anglesey and mainland north Wales - ahead of the structure’s 200th anniversary year in 2026.

Spencer Group’s specialist bridges team has global experience in high-level bridge works. It developed the Cable Crawler gantry system to enable vital dehumidification work to prevent corrosion of cables on the Severn, Forth Road and Humber suspension bridges in the UK, as well as the Alvsborg Bridge in Sweden. The company was founded by the now executive chairman Charlie Spencer in 1989 and is headquartered in Hull, northern England.

For more information on companies in this article

Related Content

  • Building Norway's longest suspension bridge
    March 2, 2012
    AT 1.38KM LONG, the new €213 million Hardanger Bridge crossing Hardangerfjord, Norway's second largest fjord, will be the country's longest suspension bridge. The structure, designed by Norway's Forum Arkitekter, will be a new landmark with its 200m high concrete towers and steel construction.
  • UK’s Humber Bridge Board to deploy automatic tolling system
    May 13, 2014
    The Humber Bridge Board in the UK is set to deploy an automatic tolling system at the famous structure near Kingston upon Hull in northern England from the autumn of 2014 to the spring of 2015. The number of manual payment toll booths is being reduced to three from six to accommodate two free-flow lanes and automatic tolling infrastructure. The updated booths are anticipated to be operational in June 2014 or early July 2014. Until the installation of the automated system is complete, the toll booths will co
  • Urgent repairs to Forth Rd bridge
    March 19, 2012
    Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds. The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks. On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.
  • Bankia and FCC sell Globalvia to OPTrust, USS and PGGM
    October 27, 2015
    Investment bank Bankia and Spanish construction firm FCC have sold their 50-50 joint venture infrastructure management firm Globalvia to three pension funds for €420 million. Madrid-based Bankia and FCC -- Fomento de Construcciones y Contratas, based in Barcelona -- said their decision to sell their holdings was part of their plans to divest non-strategic businesses. Globalvia manages public-private partnerships, of which 90% are in Spain. Purchasers are UK-based USS, OPTrust in Canada and Netherlands-ba