Skip to main content

“Sorry honey, I have to run”, or how to enjoy a Bauma exhibition

When you have only a limited time to visit a large exhibition, such as Bauma in Munich, Germany, you have to move fast to touch base with all people you need to see. There is a video that shows how one man -- obviously he was in training for a while – made the most of his less than 3 minutes at Bauma. The video reminds World Highways’ editorial director Geoff Hadwick that he has been there and done that… in his younger days, at least.
March 11, 2015 Read time: 1 min
RSSWhen you have only a limited time to visit a large exhibition, such as 688 Bauma in Munich, Germany, you have to move fast to touch base with all people you need to see.

There is a video that shows how one man -- obviously he was in training for a while – made the most of his less than 3 minutes at Bauma.

The video reminds World Highways’ editorial director Geoff Hadwick that he has been there and done that… in his younger days, at least.

For more information on companies in this article

Related Content

  • Kenya highway link upgrade planned
    June 19, 2017
    Plans are moving forward with regard to the upgrade work to the highway connecting Kenya’s capital Nairobi with the port of Mombasa.
  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours
  • New small bridge inspection from Moog
    January 6, 2017
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.
  • New small bridge inspection from Moog
    April 17, 2013
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.