Skip to main content

Slovenia puts ETC on hold

Plans for the implementation of a new electronic toll collection (ETC) system in Slovenia have been placed on hold, as the government has suspended the international tender for the project.
March 19, 2012 Read time: 1 min
Plans for the implementation of a new electronic toll collection (ETC) system in Slovenia have been placed on hold, as the government has suspended the international tender for the project. The Slovenian government says that given the present economic conditions, it did not make business sense to invest in wholly new electronic system.

Related Content

  • Increased infrastructure spending
    February 22, 2012
    With economies booming in the BRIC countries and other regions, spending on infrastructure is at a high - Patrick Smith reports As economic crisis grips much of the world, many countries are still spending billions on infrastructure to improve transportation. While the USA and Europe struggle with debt problems (and this has affected much of the rest of the world) the development of highways, airport, ports and other infrastructure is gathering pace in other regions to boost economic developments.
  • Indonesia: bauma 2013’s partner country
    March 22, 2012
    Indonesia has a population of 238 million, a gross domestic product of US$720 billion (2010) and is one of the world's 20 largest economies. The building industry is booming and in the raw materials sector major investment is scheduled for the medium term. “All all of which are good reasons why bauma should focus more closely on this economic region and the exciting opportunities it offers for the future,” says Messe München International (MMI), organiser of bauma 2013, to be held in Munich, Germany, from 1
  • Improved link proposed for Slovenia-Austria
    February 4, 2016
    Plans are being set out for improvements to the key road connection linking Slovenia with Austria. The proposals call for a second Karavanke Tunnel. At present a single two lane tunnel connects Jesenice in Slovenia with Villach in Austria. Completed in 1991, the tunnel suffers heavy congestion at present with traffic delays frequent at peak periods and particularly during the holiday season. A second tunnel would boost capacity and help reduce the delays. Geological survey work will have to be carried out a
  • Yotta’s Horizons and Mayrise create a route map of the world
    September 14, 2016
    Simon Topp, director of international business at software developer Yotta, explained the need for having the best possible plan in place. Highways agencies and departments the world over face a raft of complex and difficult challenges when it comes to managing and maintaining their infrastructure assets. In some countries, where natural disasters or extreme weather events are endemic, good asset management will need to be supplemented by risk and resilience planning. In the US, for example, the Feder