Skip to main content

Skanska wins E18 section near Oslo

Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.
By David Arminas June 19, 2023 Read time: 2 mins
Noise barriers on the western approach to the Høvik Tunnel – under construction and just outside Oslo - will have solar panels mounted on them (image courtesy Aas-Jakobsen AS/Statens vegvesen)

Skanska Norway has won a contract to construct 2.3km of the new E18 in Bærum, a municipality in the greater Oslo area.

The deal covers the section between Fornbebukrysset and Strand and will have six lanes, of which one lane in each direction will be reserved for public transport and heavy vehicles. Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.

The existing E18 in the area carries around 90,000 vehicles daily.

Under a different contract, construction of the Høvik Tunnel started in January. Most of the tunnel – around 1.75km – will run though rock and Skanska will be constructing in concrete an extension to the structure.

According to the Norwegian Public Roads Administration, Statens vegvesen, when the Høvik Tunnel is completed in a few years' time, the tunnel portal from the west will be illuminated using power from solar cells that will be situated on 7m-high noise barriers running along the E18.

However, the agency said installation of both noise barriers and solar panels is a few years down the road. The plan is for the barriers to be in place at Ramstadsletta in 2026/27. The barriers will have a curvature favourable for exposing the solar panels to the sun and cover an area between 250-300m² on the south side of the road, just before the planned Ramstadsletta Bridge. With today's technology, this gives a power production of at least 50kW.

Some attempts have previously been made to use solar cells for tunnel lighting in smaller single-pass tunnels. But the E18 West Corridor is the first to test it on a highly traffic road.

For more information on companies in this article

Related Content

  • Lindsay moveable barrier system earns MASH approval in the US
    May 14, 2018
    Lindsay Transportation Solutions has announced that its QuickChange Moveable Barrier Concrete Reactive Tension System (QMB-CRTS) has earned MASH approval. The system meets crash test and evaluation criteria contained in the American Association of State Highway and Transportation Officials’ Manual for Assessing Safety Hardware (MASH). MASH is the new standard for the crash-testing of safety devices for use on the National Highway System. It updates and replaces NCHRP Report 350. “We are pleased to inform
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.