Skip to main content

Skanska wins E18 section near Oslo

Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.
By David Arminas June 19, 2023 Read time: 2 mins
Noise barriers on the western approach to the Høvik Tunnel – under construction and just outside Oslo - will have solar panels mounted on them (image courtesy Aas-Jakobsen AS/Statens vegvesen)

Skanska Norway has won a contract to construct 2.3km of the new E18 in Bærum, a municipality in the greater Oslo area.

The deal covers the section between Fornbebukrysset and Strand and will have six lanes, of which one lane in each direction will be reserved for public transport and heavy vehicles. Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.

The existing E18 in the area carries around 90,000 vehicles daily.

Under a different contract, construction of the Høvik Tunnel started in January. Most of the tunnel – around 1.75km – will run though rock and Skanska will be constructing in concrete an extension to the structure.

According to the Norwegian Public Roads Administration, Statens vegvesen, when the Høvik Tunnel is completed in a few years' time, the tunnel portal from the west will be illuminated using power from solar cells that will be situated on 7m-high noise barriers running along the E18.

However, the agency said installation of both noise barriers and solar panels is a few years down the road. The plan is for the barriers to be in place at Ramstadsletta in 2026/27. The barriers will have a curvature favourable for exposing the solar panels to the sun and cover an area between 250-300m² on the south side of the road, just before the planned Ramstadsletta Bridge. With today's technology, this gives a power production of at least 50kW.

Some attempts have previously been made to use solar cells for tunnel lighting in smaller single-pass tunnels. But the E18 West Corridor is the first to test it on a highly traffic road.

For more information on companies in this article

Related Content

  • Slovakia starts on Presov northern bypass
    August 15, 2019
    Work has started on the first stage of the 4.3km-long Presov northern bypass, part of the R4 speedway in eastern Slovakia.
  • Traffic control to beat congestion
    November 6, 2012
    Max Lay discusses how congestion has posed problems throughout history from early civilisation to the present day One of the earliest known human settlements was at the Springs of Elisha at Jericho. Inevitably, locals collecting fresh water from the springs would encounter other water carriers. When a path was too narrow, or access to it was too limited, or it crossed another path, some carriers would find it necessary to stand aside for others. Priority in such cases might be based on common courtesy and p
  • Somague consortium wins deal for Ponte 25 de Abril
    September 27, 2018
    Portuguese infrastructure operator Infraestruturas de Portugal has awarded Somague a €12.6 million maintenance and refurbishment contract for work on the bridge Ponte 25 de Abril. Somague is heading up a consortium that includes Sociedade de Montagens Metalomecânicas and Reparação, Consolidação e Modificação de Estruturas. The 25 de Abril, a 2.3km suspension bridge for vehicles and trains over the Tagus River, connects Portugal’s capital city Lisbon to the municipality of Almada. It was built by the A
  • Cleaner engines, reduced emissions
    February 17, 2012
    The forthcoming Tier 4 emissions legislation represents a great leap forward in technology, Mike Woof reports