Skip to main content

Skanska wins E18 section near Oslo

Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.
By David Arminas June 19, 2023 Read time: 2 mins
Noise barriers on the western approach to the Høvik Tunnel – under construction and just outside Oslo - will have solar panels mounted on them (image courtesy Aas-Jakobsen AS/Statens vegvesen)

Skanska Norway has won a contract to construct 2.3km of the new E18 in Bærum, a municipality in the greater Oslo area.

The deal covers the section between Fornbebukrysset and Strand and will have six lanes, of which one lane in each direction will be reserved for public transport and heavy vehicles. Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.

The existing E18 in the area carries around 90,000 vehicles daily.

Under a different contract, construction of the Høvik Tunnel started in January. Most of the tunnel – around 1.75km – will run though rock and Skanska will be constructing in concrete an extension to the structure.

According to the Norwegian Public Roads Administration, Statens vegvesen, when the Høvik Tunnel is completed in a few years' time, the tunnel portal from the west will be illuminated using power from solar cells that will be situated on 7m-high noise barriers running along the E18.

However, the agency said installation of both noise barriers and solar panels is a few years down the road. The plan is for the barriers to be in place at Ramstadsletta in 2026/27. The barriers will have a curvature favourable for exposing the solar panels to the sun and cover an area between 250-300m² on the south side of the road, just before the planned Ramstadsletta Bridge. With today's technology, this gives a power production of at least 50kW.

Some attempts have previously been made to use solar cells for tunnel lighting in smaller single-pass tunnels. But the E18 West Corridor is the first to test it on a highly traffic road.

For more information on companies in this article

Related Content

  • Via Nordica turns international
    July 31, 2012
    Via Nordica, the road technology conference of the five Nordic countries (Denmark, Finland, Iceland, Norway and Sweden) has changed from the traditional Nordic event to become more international The conference, held every four years, rotates between the five countries, and the 2008 event, held in Helsinki, the Finnish capital, was a clear demonstration of the international trend. An accompanying exhibition attracted more than 70 companies and organisations from 14 countries. Pär-Håkan Appel, the secretary g
  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • Sennenbogen’s 6130 HD with diaphragm wall grab on site in Berlin
    December 18, 2017
    Berger Grundbautechnik is using two Sennenbogen duty cycle cranes simultaneously for preparatory works for the planned BAB 100 motorway in Berlin. The new stretch of motorway will connect the eastern areas of Berlin to the central road circuit and the BAB 113. Large sections of the section being built run in a tunnel or in a trough of up to 7m. Hard at it are the Sennenbogen 690 HD and the new 6130 HD units. With a working weight of 130tonnes and two 300kN free-fall winches, the 6130 HD operates a 25tonne
  • Safety legislation leads to tunnel upgrades
    February 22, 2012
    Tougher legislation on tunnel safety means that Norway will have to invest heavily in upgrading underground road links.