Skip to main content

Skanska Balfour Beatty install first M25 superspan gantry during motorway upgrade

The first superspan gantry has been installed over the M25 motorway near London, England. The structure near Junction 24 (Potters Bar, Hertfordshire) is part of the €219.92 million (£188 million) Managed Motorway scheme to upgrade the motorway between junctions 23 and 27. Weighing 36 tonnes and measuring 40m across, it is the first of five superspan gantries which will be installed during the project being carried out by Skanska Balfour Beatty, on behalf of the Highways Agency. The gantries will
August 22, 2013 Read time: 1 min
The first superspan gantry is lifted into place by Skanska Balfour Beatty over the M25 at Junction 24
The first superspan gantry has been installed over the M25 motorway near London, England.

The structure near Junction 24 (Potters Bar, Hertfordshire) is part of the €219.92 million (£188 million) Managed Motorway scheme to upgrade the motorway between junctions 23 and 27.

Weighing 36 tonnes and measuring 40m across, it is the first of five superspan gantries which will be installed during the project being carried out by 2296 Skanska 1146 Balfour Beatty, on behalf of the 2309 Highways Agency.  

The gantries will display valuable information for road users to help reduce congestion and ease traffic flow.

The overall Managed Motorway scheme is due to be completed between October and December 2014.

For more information on companies in this article

Related Content

  • Uretek delivers voided soils treatment for UK’s M3 Smart Motorway
    February 8, 2018
    Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project. Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems. The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.
  • Turner & Townsend picks up services deal for Stonehenge in the UK
    April 6, 2018
    Professional services company Turner & Townsend has been appointed to provide commercial services for two major Highways England programmes, including its flagship A303 Stonehenge scheme. The A303 upgrade includes plans to build a road tunnel near Stonehenge, a prehistoric monument in western England believed to have been built around 3,100 BC. The road project is part of a series of planned upgrades to A303/A358 corridor to improve connectivity between the south east and south west of England. The
  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
  • Weigh in motion and ANPR techology aid highway protection
    April 10, 2012
    Weigh-in-motion technology manufacturers have been involved in a number of significant highways tolling projects across the world in recent months, while others are looking to become involved in major new initiatives. Guy Woodford reports. The continuing global economic crisis did not prevent UK-based TDC Traffic Systems from recently securing the prized US$2.84million (€2.14million) contract to supply 20 high speed weigh-in-motion (WIM) systems for overweight pre-selection and enforcement in Saudi Arabia