Skip to main content

Singapore's key route upgrade

Singapore's Land Transport Authority (LTA) is going ahead with plans to upgrade the Pan Island Expressway (PIE).
February 14, 2012 Read time: 1 min
2652 Singapore's Land Transport Authority (LTA) is going ahead with plans to upgrade the Pan Island Expressway (PIE). Two sections of the existing route will be widened, boosting capacity and improving traffic flow at peak periods. The project calls for extra lanes to be added in either direction to the sections of the road experiencing most congestion at present. One of the sections is between the Bukit Timah Expressway (BKE) and the Adam Road exit, while the other runs from the Clementi Avenue 6 exist to the BKE. The US$63 million project will be carried out by contractor Hwang Seng Builder, which will commence working on the upgrade in July-December 2011 and complete the work by 2014.

For more information on companies in this article

Related Content

  • Jerusalem bottleneck route to be upgraded
    March 1, 2012
    The upgrading of Highway 1 between Sha'ar Hagay and the entrance to Jerusalem, Israel, a 2.5 billion NIS project (US$733 million), is expected to take five years to complete.
  • Virginia tunnel project seeing advance
    July 19, 2023
    Virginia’s massive tunnel project is seeing advance.
  • New bridge will connect Singapore and Malaysia
    September 11, 2013
    Plans are moving ahead for a new bridge to connect Singapore and Malaysia that will improve transport links. The project is being evaluated at present by the Malaysian and Singapore Governments. Should this project get the go-ahead, it will help improve traffic flow between Malaysia and Singapore. Two links connect Malaysia and Singapore at present but traffic volumes are increasing and the governments of both countries see the need to provide greater capacity. The new link will connect Changi in Singapore
  • Kathmandu's road widening project to ease congestion
    May 11, 2012
    The authorities in Nepal’s capital Kathmandu are working on widening the Kathmandu Valley road, a key project that has already seen the demolition of many structures along its boundary. The take-up of land has been eased by The Road Act, Nepal, which secures the roadside area of 25m on either side of the road on the National Highway.