Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • Qatar starts work on the state’s longest cable stayed bridge
    April 23, 2019
    Qatar has started construction of a 1.2km cable-stayed bridge that will be the longest in the Gulf state. The bridge will have 20 pylons and 16 piers to reach the highest point of 30m. It is part of the Sabah Al-Ahmad Corridor project, according to the Public Works Authority of Qatar (Ashgal). With four lanes in each direction, the bridge will accommodate more than 16,000 vehicles a hour, according to Ashghal engineer Abdullah al-Naiemi. Comnpletion is set for early 2021. Meahwhile, the Haloul Int
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • Colombia investing in new highways
    February 10, 2014
    Colombia's national infrastructure agency (ANI) has prequalified 10 companies for its US$770 million highway project Autopista al Mar 2. This new route will improve connections in western Antioquia department between Medellín and the Pacific coast, according to Business News Americas. The project is for the operation and maintenance of 176km of highways, as well as the construction of 41 bridges and 19 tunnels. Among the companies prequalified are Spain's Sacyr, Cintra, Acciona and OHL, France's Vinci, and