Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • Carbon neutral roads future for Norway
    May 10, 2022
    Norway is looking to make its roads carbon neutral.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.