Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • Paving a tunnel at altitude
    September 3, 2021
    A road tunnel stretch that opened for traffic in India in late 2020 is notable for several reasons. The new 9km Atal Tunnel is the world’s longest tunnel at an altitude of higher than 3,048m
  • Three offers for major Norwegian road and rail project
    April 24, 2012
    Three firms remain in the competition for the E6-Dovrebanen road and railway construction project in Norway. The project will run between Brøhaug and Strandlykkja in Eidsvoll and Stange in the east of the country. Veidekke and Hochtief Solutions have made a joint offer of US$276.1milion (NOK1.57billion); NCC and Alipne JV have tabled a bid of around $324.4million (NOK1.84billion); and AF Gruppen have offered $387.9million (NOK2.2billion). A fourth offer is reported to have been rejected by the national road
  • Colombia contract won by consortium
    July 28, 2015
    Colombia’s National Infrastructure Agency (ANI), has awarded a consortium led by Spanish construction firm, Sacyr, a contract for work on the Pasto to Rumichaca highway. The route lies near Colombia’s border with Ecuador. This project forms part of the second wave of 4G road concessions being awarded. A second carriageway will be built for 80km between Ipiales and Catumbuco, with six road intersections, 2.6km of tunnels and 1.5km of bridges, pontoons and viaducts. The SAC 4G consortium comprises Sacyr and H
  • Costs climb for Messina bridge in Italy
    February 24, 2012
    The cost of the Strait of Messina bridge looks set to climb from original estimates.