Skip to main content

Shortlist set for Norway’s Sotra PPP project

Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
By David Arminas May 21, 2020 Read time: 2 mins
The proposed four-lane Sotra Connection linking Bergen to Sotra island (photo Statens Vegvesen)

Norway has shortlisted three consortia – Sotra Link, Itias and Vis Sotra – for the US$1.15 billion Sotra tunnel and bridge project in the county of Hordaland.

Sotra Link comprises Spain’s FCC Construcción, Italy’s Webuild (formerly Salini Impregilo), SK Engineering from South Korea and Macquarie Corporate Holdings.

Itias includes Italian contractor Itinera and also its parent company Italian toll road operator ASTM as well as IHI from Japan.

Via Sotra is composed of France’s Vinci Concessions, Vinci Highways, Spain’s Acciona Concesiones, and Implenia Switzerland.

Final choice for the €900 million public-private project, a 25-year finance, build and operate contract, will be made by the end of the year, according to the state road authority Statens Vegvesen. Work will start in early 2021 on the project, officially called the National Road 555 Sotra Connection.

The proposed four-lane Sotra suspension bridge is 29.5m wide and has a 592m main span with the two towers rising 144m above sea level. A separate pedestrian path and separate cycle lane, both 5m wide, were part of the design.

The project overall has 19 other smaller bridges, 11 overpasses/underpasses and 21 tunnel portals. Around 11 tunnels through the mountains were envisaged, from 1-2km longs. Around 24km of access roads are scheduled with nearly 14km of bicycle and pedestrian paths, around 3m wide.

The new bridge is to be built parallel to the existing two-lane 1.2km concrete suspension Sotra Bridge that opened in 1971. It carries around 22,700 daily, estimated to rise to 26,000 by 2024. It crosses Knarreviksundet (Knarrevik Sound) that separates the island of Litlesotra, part of the Sotra archipelago, from the mainland and the city Bergen.

A new bridge is needed because, according to Statens Vegvesen, over the past 15 years there has been a strong increase in traffic between Sotra and Bergen. But old bridge is vulnerable to high winds and is closed when wind speed exceeds 30m/sec.

A tender planned for early last year was cancelled because of geological issues near Lake Storavatnet, noted Jon Georg Dale, minister of transport, at the time. Also, reconstruction of a high-voltage power cable had come under question.

For more information on companies in this article

Related Content

  • Slovakia starts on Presov northern bypass
    August 15, 2019
    Work has started on the first stage of the 4.3km-long Presov northern bypass, part of the R4 speedway in eastern Slovakia.
  • Delays ahead for Slovakia’s Visnove tunnel
    September 5, 2018
    Slovakia's transport ministry says the 7.5km Visnove tunnel near Zilina, part of the D1 motorway, will be delayed by two years to open in 2022. The recent announcement came as the ministry agreed to an extension to the construction permit held by Salini Impregilo for work on the twin-tube tunnel. The design-and-build contract worth about €410 million was assigned to the Salini Impregilo-led joint venture DUHA in 2014 by the National Highway Company NDS.
  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.
  • Volvo CE articulated haulers in Missouri deep
    May 24, 2013
    In southeast of US state Missouri, Volvo Construction Equipment articulated haulers are working in the mines of the Viburnum Trend, an area well known for its rich offering of valuable mineral deposits, including zinc, copper and lead. At 64km long by an average of 152m wide – and in some parts as thick as 30.5m deep – the Viburnum Trend, known locally as the Lead Belt, is one of the most significant bodies of ore in the world. Before mining operations began, the Trend was estimated to contain mineral resou