Skip to main content

Safety improvements for UK’s level crossings

As part of a recent rail investment package, the Department for Transport has ring-fenced a US$100 million fund for safety improvements to level crossings between 2014 and 2019, and Optex has announced that its Redscan laser detector has been specified as part of a new solution to automate signalling and detect whether or not a level crossing is clear from vehicles and pedestrians before allowing a train to pass through.
July 27, 2012 Read time: 2 mins
RSSAs part of a recent rail investment package, the 5432 Department for Transport has ring-fenced a US$100 million fund for safety improvements to level crossings between 2014 and 2019, and Optex has announced that its Redscan laser detector has been specified as part of a new solution to automate signalling and detect whether or not a level crossing is clear from vehicles and pedestrians before allowing a train to pass through.

Following nearly two years of testing, TEW Plus, a supplier of specialist CCTV and security products, has achieved full 4139 Network Rail Product Approval for its level crossing obstacle detector using the Redscan as the core detection element. The complete MCB-OD Level Crossings solution incorporates Lidar as the complimentary obstacle detector (COD) working alongside Radar and CCTV surveillance equipment. The solution will be rolled out to more than 400 level crossings over the next five years.

In separate news, Network Rail is to install a spoken-word warning system at 63 level crossings, starting in the York/Selby area. Instead of a two-tone alarm, a spoken announcement will warn if another train is approaching. The Rail Safety and Standards Board has advised that voice messages should improve awareness, instead of relying solely on alarms.

For more information on companies in this article

Related Content

  • New Zealand’s Waterview project is moving closer to completion
    December 13, 2016
    New Zealand’s biggest road project is less than a year away from completion, and a lot of progress has been made since World Highways last looked at the project two years ago - Mary Searle Bell reports New Zealand’s Waterview project is moving closer to completion and will be the largest road project in the country. The NZ$2 billion Western Ring Route will see the creation of an alternative motorway to State Highway 1, which runs through the centre of Auckland. The 47km-long motorway will allow a large p
  • Topcon’s action station
    October 31, 2012
    Topcon Europe Positioning (TEP) has launched a new, professional-grade robotic total station – the PS series – which the firm says is designed to surpass the power, accuracy and capabilities of its peers. The PS is said to utilise Topcon’s new PowerTrac technology to increase the prism tracking power. “Using new optics, laser system and advanced algorithms, PowerTrac provides the PS with the ability to keep tracking a moving prism even under the toughest environmental conditions,” said Leighton Davies, surv
  • An array of barrier innovations is coming to market
    January 4, 2013
    Various developments are affecting the market for highway barriers - Mike Woof writes The global market for highway barrier products continues to see the introduction of new products and new standards. Some standards for barriers are also eagerly awaited and clarification is still required of the regulations surrounding motorcycle-safe barrier types. In recognition of the issues concerning bad weather on Europe’s roads in winter periods, a new amendment has been made to the EN1317 standard for safety barrie
  • Brazil launches new transport infrastructure investment plan
    August 30, 2012
    The Brazilian government has announced a new transport infrastructure investment plan involving the concession of motorway operations and modernisation of the railway sector. The private public partnerships are predicted to lead to an investment of US$65.68 billion (BRL 133bn) in the next 25 years, including US$ 39.63 billion (BRL 80bn) to be spent in the first five years of the contract.