Skip to main content

Safety improvements for UK’s level crossings

As part of a recent rail investment package, the Department for Transport has ring-fenced a US$100 million fund for safety improvements to level crossings between 2014 and 2019, and Optex has announced that its Redscan laser detector has been specified as part of a new solution to automate signalling and detect whether or not a level crossing is clear from vehicles and pedestrians before allowing a train to pass through.
July 27, 2012 Read time: 2 mins
RSSAs part of a recent rail investment package, the 5432 Department for Transport has ring-fenced a US$100 million fund for safety improvements to level crossings between 2014 and 2019, and Optex has announced that its Redscan laser detector has been specified as part of a new solution to automate signalling and detect whether or not a level crossing is clear from vehicles and pedestrians before allowing a train to pass through.

Following nearly two years of testing, TEW Plus, a supplier of specialist CCTV and security products, has achieved full 4139 Network Rail Product Approval for its level crossing obstacle detector using the Redscan as the core detection element. The complete MCB-OD Level Crossings solution incorporates Lidar as the complimentary obstacle detector (COD) working alongside Radar and CCTV surveillance equipment. The solution will be rolled out to more than 400 level crossings over the next five years.

In separate news, Network Rail is to install a spoken-word warning system at 63 level crossings, starting in the York/Selby area. Instead of a two-tone alarm, a spoken announcement will warn if another train is approaching. The Rail Safety and Standards Board has advised that voice messages should improve awareness, instead of relying solely on alarms.

For more information on companies in this article

Related Content

  • 3i buys SRL Traffic Systems
    March 29, 2022
    SRL Traffic Systems, a UK and Republic of Ireland manufacturer of portable and temporary intelligent transport system (ITS) solutions, has been bought by 3i Infrastructure.
  • Positioning tools continue to improve
    July 16, 2012
    Topcon says that its new IP-S2 package combines GNNS positioning capabilities with inertial sensors, while the firm also has a solution for customers wanting to mix and match receiver components. The IP-S2 is a vehicle-mounted, mobile 3D tool that offers precision mapping and surveying capabilities. The package collects data using 3D laser scanners, LIDAR, and/or cameras, and this is then integrated, time-stamped and geo-referenced. The customer can use this assembled data to combine LIDAR point cloud and d
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen