Skip to main content

Royal treatment for Hull’s Princes Quay Bridge

Finishing touches are being put on Princes Quay Bridge in the northern English city of Hull, in East Yorkshire county, for opening this spring.
By David Arminas January 30, 2020 Read time: 2 mins
The Princes Quay Bridge for cyclists and pedestrians sits over the A63 in the English city of Hull

The €14 million bridge spans the A63 and, when open, will enable pedestrians and cyclists to cross over the busy dual carriageway.
 
The assembled 60m-long bridge – weighing 150tonnes - was delivered to its final position last November and then manoeuvred through closed streets into position over the A63 during a single night. The marina platform has been completed, the supports for the steel ramps have been installed and construction has started on the bridge ramps and stairs.
 
Concrete work on the bridge, laying the paving, landscaping and finishing the ramps will complete the project for an opening something this spring.

The Highways England project, which is the first phase of the A63 Castle Street road improvement scheme, will shape the future of Hull and connect key sites in the city. The bridge is expected to open in the spring which will signal the start of the main scheme.
 
The proposed €417 million main scheme will create a junction by lowering the level of the A63 at the Mytongate junction. Ferensway and Commercial Road will cross the A63 creating a split-level junction.

Between Princes Dock Street and Market Place the proposal is to widen the eastbound carriageway to three lanes and build another footbridge over the A63, this time at Porter Street.

Related Content

  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.