Skip to main content

Remote working for Avery Dennison on the island of St. Helena

Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of Avery Dennison Refiective Solutions most remote traffic sign projects. The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 af
March 22, 2017 Read time: 2 mins
Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of 1540 Avery Dennison Refiective Solutions most remote traffic sign projects.

The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 after his defeat at the Battle of Waterloo. He died there in 1821.

Today, the island’s population of just over 4,500 is hoping that the new airport – when opened - will boost tourism to make the island self-sufficient. To replace the five-day boat trip from Africa, the UK government ploughed upwards of US$346 million to build the airport which has yet to open because of remaining concerns about wind shear affecting landing aircraft.

However, the road infrastructure for the design-build-operate airport project is in place, thanks to work by Basil Read. Deon De Jager, Basil Read’s director for St Helena, contracted Repro Signs, a South African traffic sign fabricator, to supply signage for the project. Repro Signs chose products from Avery Dennison Refiective Solutions.

Avery Dennison products, sent by Repro Signs from South Africa, included reflective sheeting and sign-converting supplies required to create all of the project’s highway signs. Given the sea voyage delivery time, all orders had to be filled perfectly first time every time, said Johan Winterbach, southern Africa area business manager for Avery Dennison.

For more information on companies in this article

Related Content

  • Cuenca pushes ahead with 50km ring road
    September 2, 2015
    The Ecuadorian city of Cuenca, a UNESCO World Heritage Site, is in discussions with contractors for construction of a 50km ring road. The city – whose full name is Santa Ana de los cuatro ríos de Cuenca - is the capital of the highland Azuay province and around 2,500m above sea level. It has a population of around 400,000 rising to 700,000 in the larger metro area. Ecuadorian media reports put the cost of the road at around US$600 million. The initiative will be financed by the private sector and the winn
  • French Total expands with new PMB plant
    February 7, 2012
    A new PMB plant has opened in Dubai as part of the French Total Group's plans to expand in the Middle East. As part of the Total Group's plans for expansion in Middle East countries, a decision was taken in 2008 to include specific facilities dedicated to supply raw bitumen and to manufacture polymer modified bitumen (PMB).
  • Western construction firms operating in developing nations face extra challenges
    January 9, 2024
    Contracting firms carrying out road construction works in developing nations can face extra challenges - Gordon Feller reports
  • Solar roads such as Colas’s Wattway could be the right way
    April 26, 2016
    Peter Harrop, chairman of independent research and consultancy IDTechEx, considers arguments in favour of solar roads Nowadays a major trend is the move to off-grid clean energy created by “energy harvesting” to produce electricity where it is needed. This is more controllable and increasingly at lower cost than grid power or diesel gensets, cleaner, and often less subject to interruption. It is taking new forms as revealed in the IDTechEx Research report, “High Power Energy Harvesting 2016-2026”.