Skip to main content

Remote working for Avery Dennison on the island of St. Helena

Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of Avery Dennison Refiective Solutions most remote traffic sign projects. The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 af
March 22, 2017 Read time: 2 mins
Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of 1540 Avery Dennison Refiective Solutions most remote traffic sign projects.

The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 after his defeat at the Battle of Waterloo. He died there in 1821.

Today, the island’s population of just over 4,500 is hoping that the new airport – when opened - will boost tourism to make the island self-sufficient. To replace the five-day boat trip from Africa, the UK government ploughed upwards of US$346 million to build the airport which has yet to open because of remaining concerns about wind shear affecting landing aircraft.

However, the road infrastructure for the design-build-operate airport project is in place, thanks to work by Basil Read. Deon De Jager, Basil Read’s director for St Helena, contracted Repro Signs, a South African traffic sign fabricator, to supply signage for the project. Repro Signs chose products from Avery Dennison Refiective Solutions.

Avery Dennison products, sent by Repro Signs from South Africa, included reflective sheeting and sign-converting supplies required to create all of the project’s highway signs. Given the sea voyage delivery time, all orders had to be filled perfectly first time every time, said Johan Winterbach, southern Africa area business manager for Avery Dennison.

For more information on companies in this article

Related Content

  • Huge potential of Kenya’s bitumen market
    May 17, 2017
    Kenya’s bitumen demand to grow - Shem Oirere writes. Kenya’s demand for bitumen products is set to increase with recent budget allocations for construction of new roads, ports and airports and for maintenance of existing transport infrastructure. The country’s economic growth rose from 5.3% in 2014 to 5.5% in 2015 and is projected to hit 6% and 6.4% in 2016 and 2017 respectively according to the African Development Bank, triggering demand for better and modern infrastructure particularly in the transport se
  • China opens record-breaking bridge
    April 11, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o
  • Wirtgen milling machines and soil stabilisers land in Sardina
    July 26, 2016
    Wirtgen cold milling machines recently demonstrated their ability on runway rehabilitation work at Alghero-Fertilia Airport in Sardinia. Alghero-Fertilia Airport, about 8km northwest of Alghero, is one of three commercial airports on the Italian island. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally serves this purpose today. It is also a major hub for low-cost carriers that ferry many of the annual 1.7 million passengers who pass through the airport. Summer tourist mo
  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.