Skip to main content

Remote working for Avery Dennison on the island of St. Helena

Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of Avery Dennison Refiective Solutions most remote traffic sign projects. The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 af
March 22, 2017 Read time: 2 mins
Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of 1540 Avery Dennison Refiective Solutions most remote traffic sign projects.

The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 after his defeat at the Battle of Waterloo. He died there in 1821.

Today, the island’s population of just over 4,500 is hoping that the new airport – when opened - will boost tourism to make the island self-sufficient. To replace the five-day boat trip from Africa, the UK government ploughed upwards of US$346 million to build the airport which has yet to open because of remaining concerns about wind shear affecting landing aircraft.

However, the road infrastructure for the design-build-operate airport project is in place, thanks to work by Basil Read. Deon De Jager, Basil Read’s director for St Helena, contracted Repro Signs, a South African traffic sign fabricator, to supply signage for the project. Repro Signs chose products from Avery Dennison Refiective Solutions.

Avery Dennison products, sent by Repro Signs from South Africa, included reflective sheeting and sign-converting supplies required to create all of the project’s highway signs. Given the sea voyage delivery time, all orders had to be filled perfectly first time every time, said Johan Winterbach, southern Africa area business manager for Avery Dennison.

For more information on companies in this article

Related Content

  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Japan gives $3mn for iron bridges in Papua
    January 6, 2023
    Justin Tkatchenko, foreign affairs minister of Papua New Guinea, said the bridges will allow local populations in remote areas to more easily access health care.
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot