Skip to main content

Remote working for Avery Dennison on the island of St. Helena

Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of Avery Dennison Refiective Solutions most remote traffic sign projects. The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 af
March 22, 2017 Read time: 2 mins
Constructing the airport on the remote island of St. Helena has been one of the largest projects for a South African construction group. It’s the site of one of 1540 Avery Dennison Refiective Solutions most remote traffic sign projects.

The 121km² island is a British Overseas Territory in the southern Atlantic Ocean, just under 2,000km from Angola on Africa’s southwest coast and 4,000km from Rio de Janeiro on Brazil’s east coast. St Helena is noted for being where French Emporer Napoleon was exiled in 1815 after his defeat at the Battle of Waterloo. He died there in 1821.

Today, the island’s population of just over 4,500 is hoping that the new airport – when opened - will boost tourism to make the island self-sufficient. To replace the five-day boat trip from Africa, the UK government ploughed upwards of US$346 million to build the airport which has yet to open because of remaining concerns about wind shear affecting landing aircraft.

However, the road infrastructure for the design-build-operate airport project is in place, thanks to work by Basil Read. Deon De Jager, Basil Read’s director for St Helena, contracted Repro Signs, a South African traffic sign fabricator, to supply signage for the project. Repro Signs chose products from Avery Dennison Refiective Solutions.

Avery Dennison products, sent by Repro Signs from South Africa, included reflective sheeting and sign-converting supplies required to create all of the project’s highway signs. Given the sea voyage delivery time, all orders had to be filled perfectly first time every time, said Johan Winterbach, southern Africa area business manager for Avery Dennison.

For more information on companies in this article

Related Content

  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.
  • Bidders line up for Belo Horizonte road
    July 6, 2022
    The groups interested are reportedly Acciona, Sacyr, CRCC, Construcap and ECB.
  • Remote control crushing
    July 16, 2012
    Following a trial of Metso Minerals' Nordberg Plant Management System at Hanson Aggregates' Ystrad Meurig Quarry, UK, the software has now been installed on a further six mobile machines at Lithalun Quarry. Metso installed the remote control system on the Lokotrack LT300HP for Hanson last year to allow the company to test the advantages of the wireless communication capabilities. The system has now been extended to the LT110 primary crusher, another LT300HP and its two ST358 and ST620 mobile screens.
  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used