Skip to main content

RAC blasts UK Government's poor infrastructure investment

The UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands. The fou
May 14, 2012 Read time: 2 mins
RSSThe UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the 5521 RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands.

The foundation, working with consultancy group 1419 Arup, identified 96 key road schemes currently waiting for a decision by the 5432 Department for Transport. The foundation claimed the top 10 projects on this list would offer a six fold return on investment. But RAC Foundation director Professor Stephen Glaister said, "Forget about Plan B, ministers do not even have a Plan A for dealing with the awful conditions forecast for the roads in the years ahead. It is a case of jams today, and even more jams tomorrow. The Department for Transport's own figures show that by 2035 traffic is set to rise by almost 50% and delays by more than 50%. And these are only average figures."

Key projects still awaiting the decision to go into action include: A453 widening (M1 to A52) Nottingham; A5-M1 Dunstable northern bypass, Bedfordshire; A21 Tonbridge to Pembury dual carriageway, Kent; Kingkerswell bypass, Devon; Leeds Inner Ring Road; A38(M) Tame viaduct, West Midlands; A47 Blofield to North Burlingham, Norfolk; Evesham bridge maintenance, Worcestershire; A45 westbound bridge, Solihull, West Midlands; A18-A180 link, Lincolnshire. Meanwhile other projects such as the twin tube road tunnels to carry the A303 past the historic Stonehenge site have been repeatedly cancelled due to cost, despite the massive congestion and major safety issues for the existing link and the impossibility of building the widened road on the surface due to archaeological and environmental reasons.

For more information on companies in this article

Related Content

  • Towards sustainable mobility
    April 12, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility.From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes. Space on roads throughout the modern world is decreasing as the volume of cars and road users increases. How can mobility be safeguarded without compromising quality of life or environmental well-being? As engineers, we have a responsib
  • Towards sustainable mobility
    February 20, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility. From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes
  • BAM, Morgan Sindall start UK’s €112 million Oldbury viaduct job
    July 31, 2017
    A joint venture of BAM, Morgan Sindall and VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway. The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city. Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.
  • A6 project between Weinsberg and Wiesloch/Rauenberg set to start
    January 26, 2017
    Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has