Skip to main content

RAC blasts UK Government's poor infrastructure investment

The UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands. The fou
May 14, 2012 Read time: 2 mins
RSSThe UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the 5521 RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands.

The foundation, working with consultancy group 1419 Arup, identified 96 key road schemes currently waiting for a decision by the 5432 Department for Transport. The foundation claimed the top 10 projects on this list would offer a six fold return on investment. But RAC Foundation director Professor Stephen Glaister said, "Forget about Plan B, ministers do not even have a Plan A for dealing with the awful conditions forecast for the roads in the years ahead. It is a case of jams today, and even more jams tomorrow. The Department for Transport's own figures show that by 2035 traffic is set to rise by almost 50% and delays by more than 50%. And these are only average figures."

Key projects still awaiting the decision to go into action include: A453 widening (M1 to A52) Nottingham; A5-M1 Dunstable northern bypass, Bedfordshire; A21 Tonbridge to Pembury dual carriageway, Kent; Kingkerswell bypass, Devon; Leeds Inner Ring Road; A38(M) Tame viaduct, West Midlands; A47 Blofield to North Burlingham, Norfolk; Evesham bridge maintenance, Worcestershire; A45 westbound bridge, Solihull, West Midlands; A18-A180 link, Lincolnshire. Meanwhile other projects such as the twin tube road tunnels to carry the A303 past the historic Stonehenge site have been repeatedly cancelled due to cost, despite the massive congestion and major safety issues for the existing link and the impossibility of building the widened road on the surface due to archaeological and environmental reasons.

For more information on companies in this article

Related Content

  • €2.27bn UK road investment in 2014 to support over 9,500 construction jobs
    November 11, 2013
    Over 9,500 construction jobs will be supported in 2014 by more than €2.27 billion (£1.9 billion) of investment in Britain’s roads, Transport Minister Robert Goodwill announced today. The total investment in 209 schemes is €5.15 billion (£4.3 billion), with the €2.27 billion to be spent in 2014 more than twice the amount being spent this year. Due to either start or be completed in 2014, these road programmes are estimated to boost the economy by over €22.52 billion (£18.8 billion) and are part of a €119.8
  • ARTBA makes awards
    February 29, 2012
    A series of highway and bridge projects across the US have been recognised for their contributions to environmental protection and mitigation.
  • A1 Upgrade section opens in the UK
    March 27, 2019
    A key section of the UK’s important A1 route is now open to traffic.
  • Strategic road plan announced in the UK
    May 23, 2023
    A statement from National Highways in the UK said the emphasis is on boosting the economy “in an environmentally sustainable way” up to 2030 and beyond.