Skip to main content

RAC blasts UK Government's poor infrastructure investment

The UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands. The fou
May 14, 2012 Read time: 2 mins
RSSThe UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the 5521 RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands.

The foundation, working with consultancy group 1419 Arup, identified 96 key road schemes currently waiting for a decision by the 5432 Department for Transport. The foundation claimed the top 10 projects on this list would offer a six fold return on investment. But RAC Foundation director Professor Stephen Glaister said, "Forget about Plan B, ministers do not even have a Plan A for dealing with the awful conditions forecast for the roads in the years ahead. It is a case of jams today, and even more jams tomorrow. The Department for Transport's own figures show that by 2035 traffic is set to rise by almost 50% and delays by more than 50%. And these are only average figures."

Key projects still awaiting the decision to go into action include: A453 widening (M1 to A52) Nottingham; A5-M1 Dunstable northern bypass, Bedfordshire; A21 Tonbridge to Pembury dual carriageway, Kent; Kingkerswell bypass, Devon; Leeds Inner Ring Road; A38(M) Tame viaduct, West Midlands; A47 Blofield to North Burlingham, Norfolk; Evesham bridge maintenance, Worcestershire; A45 westbound bridge, Solihull, West Midlands; A18-A180 link, Lincolnshire. Meanwhile other projects such as the twin tube road tunnels to carry the A303 past the historic Stonehenge site have been repeatedly cancelled due to cost, despite the massive congestion and major safety issues for the existing link and the impossibility of building the widened road on the surface due to archaeological and environmental reasons.

For more information on companies in this article

Related Content

  • English road works planned
    June 9, 2022
    Major English road works are being planned.
  • Improve highway barriers to cope with higher speed
    February 24, 2012
    The UK association Britpave, the British In-situ Concrete Paving Association group, is keen to ensure that the country’s major highways will be able to cope with proposed speed limit increases. According to Britpave much of the UK motorway central reservation barriers may not be fit-for-purpose if the speed limit is increased from112-128km/h (70-80mph) as proposed recently.
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many