Skip to main content

Qatar causeway construction costs climb

The cost of the new causeway project linking Qatar with Bahrain is expected to hit US$5 billion in all.
March 1, 2012 Read time: 1 min
The cost of the new causeway project linking Qatar with Bahrain is expected to hit US$5 billion in all. The 40km link will feature four lanes for vehicles with two in either direction, as well as two railway tracks. The new link will carry around 4,000 vehicles/day when it opens with traffic volumes predicted to grow and hit 50,000 vehicles/day by 2050. Construction work on the Qatar-Bahrain Causeway project is expected to commence at the end of 2011 with completion due in 2015. The link will run from the Ras Isharij in Qatar to Askar in east Bahrain. The project is being carried out by a consortium that includes Middle East Dredging, Consolidated Contractors International, Vinci Grand Projects, Al Diyar Real Estate, French Contracting and 981 Hochtief.

For more information on companies in this article

Related Content

  • China’s massive new highway projects unveiled
    May 19, 2017
    Plans for massive highway construction projects have been unveiled in China. A 451km highway has been announced that will connect the cities of Yibin an Panzhihua. This is expected to cost as much as US$12 billion, with two firms carrying out the project under the build-operate-transfer model. Construction is due to commence later this year and is expected to take five years to complete. Meanwhile in Yunnan Province, the authorities are planning two highway projects worth a total of $3.75 billion. A new 50k
  • Berlin bridge replacement project planned
    November 11, 2020
    An important Berlin bridge replacement project is being planned.
  • Alleviating Moscow's ring road congestion
    February 20, 2012
    The US$10.5 billion CKAD (Moscow Region Ring Road), being planned and procured under the direction of the Ministry of Transport of Russia, is just one of the roads highlighted at the Moscow Forum.
  • Redevelopments at southern Polish airports
    August 21, 2013
    Rzeszów-Jasionka Airport in the south-east of Poland is now benefiting from a new taxiway constructed over a 50-month period and costing some €22.5 million. The work was required as the airport needs to increase capacity to cope with growing passenger traffic. The main portion of the project was for the construction of a 3km long taxiway, which lies parallel to the airport’s main runway. This taxiway now allows aircraft to manoeuvre away from the single runway and free up capacity for take-offs and land