Skip to main content

Qatar causeway construction costs climb

The cost of the new causeway project linking Qatar with Bahrain is expected to hit US$5 billion in all.
March 1, 2012 Read time: 1 min
The cost of the new causeway project linking Qatar with Bahrain is expected to hit US$5 billion in all. The 40km link will feature four lanes for vehicles with two in either direction, as well as two railway tracks. The new link will carry around 4,000 vehicles/day when it opens with traffic volumes predicted to grow and hit 50,000 vehicles/day by 2050. Construction work on the Qatar-Bahrain Causeway project is expected to commence at the end of 2011 with completion due in 2015. The link will run from the Ras Isharij in Qatar to Askar in east Bahrain. The project is being carried out by a consortium that includes Middle East Dredging, Consolidated Contractors International, Vinci Grand Projects, Al Diyar Real Estate, French Contracting and 981 Hochtief.

For more information on companies in this article

Related Content

  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Cost rise for highway project in Hamburg, Germany
    April 8, 2021
    The cost has risen for a key highway project in Hamburg, Germany.
  • Virginia Interstate highway upgrade project
    February 26, 2019
    A 15km stretch of Interstate 64 in the US state of Virginia will be upgraded, allowing it to handle more traffic.
  • Systra, Kiewit and Hatch to build third bridge in Kingston, Canada
    August 31, 2018
    Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect