Skip to main content

Qatar causeway construction costs climb

The cost of the new causeway project linking Qatar with Bahrain is expected to hit US$5 billion in all.
March 1, 2012 Read time: 1 min
The cost of the new causeway project linking Qatar with Bahrain is expected to hit US$5 billion in all. The 40km link will feature four lanes for vehicles with two in either direction, as well as two railway tracks. The new link will carry around 4,000 vehicles/day when it opens with traffic volumes predicted to grow and hit 50,000 vehicles/day by 2050. Construction work on the Qatar-Bahrain Causeway project is expected to commence at the end of 2011 with completion due in 2015. The link will run from the Ras Isharij in Qatar to Askar in east Bahrain. The project is being carried out by a consortium that includes Middle East Dredging, Consolidated Contractors International, Vinci Grand Projects, Al Diyar Real Estate, French Contracting and 981 Hochtief.

For more information on companies in this article

Related Content

  • Ammann asphalt plant for UAE road construction
    October 5, 2018
    An asphalt plant supplied by Ammann is now playing an important role in the UAE’s road construction sector The plant is producing material for major new road projects in the UAE. “We need to produce quality asphalt, and high volumes of it,” said Adnan Elmasri, operations manager for Top Link Contracting & General Transportation, based in Dubai. Top Link, a major contractor in Abu Dhabi and Dubai, is providing mix for a new highway that will help to reduce the current traffic congestion issues occurring
  • Increased costs for new Duisburg bridge
    June 2, 2020
    Increased costs are now being anticipated for the new Duisburg bridge project.
  • Qatar to spend up to $100 billion on road and rail networks before FIFA World Cup
    February 29, 2012
    According to Business Monitor International (BMI), Qatar is expected to spend US$80-100 billion over the next five years to prepare and deliver the infrastructure required to support the huge influx of visitors forecast to attend the 2022 FIFA World Cup.
  • UAE highway first section opening to traffic
    July 16, 2018
    A new highway section is now open to traffic in the UAE. This highway is designed to connect the north and south of Ras Al Khaimah emirate, extending from the Emirates Road. The new highway features three lanes in either direction, with a maximum speed limit of 140km/h and is designed to carry up to 60,000 vehicles/day. Featuring 10 intersections the Ras Al Khaimah Ring Road will measure 30km-long when complete. Work is being carried out on a number of bridges along the route with the rest of the highway li