Skip to main content

Photo tolling on the Tacoma Narrows Bridge

"We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll," said WSDoT Toll Division Director Craig Stone.
April 25, 2012 Read time: 1 min
914 Washington State Department of Transportation this weekend activated photo tolling on the Tacoma Narrows Bridge where previously drivers could stop and pay at a toll booth or use a Good To Go pass.

“We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll,” said WSDoT Toll Division Director Craig Stone. “Now, those drivers can pay the toll without being automatically fined and that money will go back to the Narrows Bridge instead of going to the court.”

The new Pay By Mail and Pay By Plate options allow drivers without a Good To Go! pass to use the electronic toll lanes. The registered owner of the vehicle will receive a toll bill in the mail. Drivers who don’t pay within 80 days will receive a notice of civil penalty for US$40 plus the accumulated tolls and fees. All money collected will go back to the Tacoma Narrows Bridge account.

For more information on companies in this article

Related Content

  • UK’s ICE highlights women in engineering
    September 17, 2024
    Since beginning the ICE Connects: Women in Fellowship programme in June 2021, there has been a 45% increase in women fellows in the UK’s Institution of Civil Engineers.
  • HCSS for data anywhere, anytime
    July 18, 2012
    Construction software developer HCSS has introduced a suite of new mobile applications for collecting and reviewing data on construction field operations. The apps by the US firm can be run anywhere using iPhones, iPads and Android-based phones and tablets. With just a few swipes on a mobile device, contractors can record an entire time card including diaries, photographs and cost-coded employee and equipment hours, as well as production quantities.
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s
  • Volz makes headway in Hesse
    November 22, 2018
    A road contractor in Germany is making use of a sophisticated logistics tool to run its operations more efficiently. The contractor, Wilhelm Schütz, is a medium-sized company with a long history in road construction and civil engineering. Based in Hesse, the firm has its own mixing plant to supply material to its road construction crews.