Skip to main content

Photo tolling on the Tacoma Narrows Bridge

"We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll," said WSDoT Toll Division Director Craig Stone.
April 25, 2012 Read time: 1 min
914 Washington State Department of Transportation this weekend activated photo tolling on the Tacoma Narrows Bridge where previously drivers could stop and pay at a toll booth or use a Good To Go pass.

“We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll,” said WSDoT Toll Division Director Craig Stone. “Now, those drivers can pay the toll without being automatically fined and that money will go back to the Narrows Bridge instead of going to the court.”

The new Pay By Mail and Pay By Plate options allow drivers without a Good To Go! pass to use the electronic toll lanes. The registered owner of the vehicle will receive a toll bill in the mail. Drivers who don’t pay within 80 days will receive a notice of civil penalty for US$40 plus the accumulated tolls and fees. All money collected will go back to the Tacoma Narrows Bridge account.

For more information on companies in this article

Related Content

  • Intelligence for compact construction machines
    November 13, 2024
    Trimble is delivering intelligence for compact construction machines.
  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c