Skip to main content

Photo tolling on the Tacoma Narrows Bridge

"We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll," said WSDoT Toll Division Director Craig Stone.
April 25, 2012 Read time: 1 min
914 Washington State Department of Transportation this weekend activated photo tolling on the Tacoma Narrows Bridge where previously drivers could stop and pay at a toll booth or use a Good To Go pass.

“We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll,” said WSDoT Toll Division Director Craig Stone. “Now, those drivers can pay the toll without being automatically fined and that money will go back to the Narrows Bridge instead of going to the court.”

The new Pay By Mail and Pay By Plate options allow drivers without a Good To Go! pass to use the electronic toll lanes. The registered owner of the vehicle will receive a toll bill in the mail. Drivers who don’t pay within 80 days will receive a notice of civil penalty for US$40 plus the accumulated tolls and fees. All money collected will go back to the Tacoma Narrows Bridge account.

For more information on companies in this article

Related Content

  • PPRS speaker and MEP Cramer will urge more road maintenance
    February 3, 2015
    The chairman of the European Parliament’s transport committee wants an emphasis on road maintenance and finishing international connecting roads systems than on new grandiose highways. If national government’s fail to do this, as it’s their responsibility, then the European Union’s major cities can look forward to increasing gridlock in the coming decades. Congestion and maintenance are first and foremost the responsibility of member states and nobody wants to change this,” said Michael Cramer, chairm
  • BIM pilot project for Peri in Germany
    April 12, 2016
    Peri is showcasing one of its latest contract wins on its stand at bauma 2016 as part of a focus on projects which aims to demonstrate the company’s wider capabilities. The formwork specialist recently won a contract with joint venture contractor Max Bögl / Porr on the Filstal railway bridge, a pilot project for the use of building information modelling (BIM). The Filstal bridge, which is on the new high-speed line between Stuttgart and Ulm, is one of four projects chosen by Germany’s Federal Ministry of Tr
  • New road funding plans face uncertain future
    September 29, 2014
    Worldwide the issue of road investment is facing close scrutiny. Developing nations are concentrating on developing road networks, benefiting from foreign loans or investments. Meanwhile in developed nations, the focus is more on road network repair rather than expansion.
  • Pointless system sets record high for new low?
    January 6, 2014
    A man in the English city of Liverpool is still allowed behind the wheel despite having accumulated 45 licence penalty points on his licence. This worrying fact was uncovered by the UK’s Institute of Advanced Motorists (IAM) following a freedom of information request to the Driver Vehicle Licensing Agency (DVLA). The points were all for failing to disclose the identity of the driver or exceeding statutory speed limit on a public road, between October 2012 and June 2013. This worryingly high number beats the