Skip to main content

Photo tolling on the Tacoma Narrows Bridge

"We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll," said WSDoT Toll Division Director Craig Stone.
April 25, 2012 Read time: 1 min
914 Washington State Department of Transportation this weekend activated photo tolling on the Tacoma Narrows Bridge where previously drivers could stop and pay at a toll booth or use a Good To Go pass.

“We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll,” said WSDoT Toll Division Director Craig Stone. “Now, those drivers can pay the toll without being automatically fined and that money will go back to the Narrows Bridge instead of going to the court.”

The new Pay By Mail and Pay By Plate options allow drivers without a Good To Go! pass to use the electronic toll lanes. The registered owner of the vehicle will receive a toll bill in the mail. Drivers who don’t pay within 80 days will receive a notice of civil penalty for US$40 plus the accumulated tolls and fees. All money collected will go back to the Tacoma Narrows Bridge account.

For more information on companies in this article

Related Content

  • Bitumen technology: three ways to more sustainable roads
    May 14, 2020
    This issue we look at three case studies showcasing new technologies designed to deliver more sustainable paving solutions.
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Trimble’s vision of a far more efficient future
    July 5, 2021
    Trimble is offering a future with more efficient, optimised construction operations for faster project delivery