Skip to main content

Peruvian port link

A key road project is now commencing in Peruvian port Callao. The work is costing some US$186.4 million and is being carried out by Brazilian contractor Andrade Gutierrez.
February 13, 2012 Read time: 1 min
A key road project is now commencing in Peruvian port Callao. The work is costing some US$186.4 million and is being carried out by Brazilian contractor 1339 Andrade Gutierrez. The project involves widening and improving Nestor Gambetta Avenue from two lanes in either direction at present to three lanes in either direction. The aim of the work is to improve traffic flow as the link carries a high percentage of heavy trucks between the Callao port and the Panamericana Norte highway. The work should be finished in 18 months.

For more information on companies in this article

Related Content

  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Nepal link benefits from Japanese funding
    February 29, 2012
    Road improvements on the key Tinkune-Jadibuti road in Nepal are now complete, with an official opening of the route having taken place.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk