Skip to main content

Peruvian port link

A key road project is now commencing in Peruvian port Callao. The work is costing some US$186.4 million and is being carried out by Brazilian contractor Andrade Gutierrez.
February 13, 2012 Read time: 1 min
A key road project is now commencing in Peruvian port Callao. The work is costing some US$186.4 million and is being carried out by Brazilian contractor 1339 Andrade Gutierrez. The project involves widening and improving Nestor Gambetta Avenue from two lanes in either direction at present to three lanes in either direction. The aim of the work is to improve traffic flow as the link carries a high percentage of heavy trucks between the Callao port and the Panamericana Norte highway. The work should be finished in 18 months.

For more information on companies in this article

Related Content

  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Concrete - a competitive option for road construction?
    February 10, 2012
    The use of advanced control technology help boost the percentage of roads built using concrete - Mike Woof reports New technologies mean that concrete offers a highly competitive option for road construction.
  • Norwegians would build new bridge and tunnel links
    June 18, 2021
    Norway’s road transport network is changing radically as the country gears up for greater EV use as well as a gradual phasing out of its traditional ferry links
  • Egyptian Government opening key project tender
    May 11, 2012
    The Egyptian Government is opening the tender process for the Rod el Farag highway in July 2012. The highway project is expected to cost US$1 billion to construct and will be carried out in two stages. One section will run from Alexandria Desert Road to the Cairo Ring Road. Meanwhile the second section will run from the Cairo Ring Road to the eastern side of the Nile-Shoubra area and the Al Ismailia Canal Road.