Skip to main content

Performance probe for National Highways

A report published last July concerning England's National Highways agency noted several risk areas where problems could arise and which have now done so, according to UK media reports.
By David Arminas February 21, 2024 Read time: 2 mins
England’s Strategic Road Network that takes in motorways and some major A-class highways – a total of 7,240km (© Jonathan Mitchell/Dreamstime)

England’s National Highways agency is being investigated because “performance has dipped in a number of areas”, the independent regulator Office of Rail and Road announced.

A report published last July noted several risk areas where problems could arise and which have now done so, according to UK media reports. These surround the delivery of major schemes and management of road assets under the five-year plan RIS2 – Road Investment Strategy 2, launched in 2020.

According to UK media, the ORR sent a letter to the National Highways chief customer and strategy officer Elliot Shaw, outlining the concerns of the ORR.

“Whilst each individual item of concern is potentially manageable, the number and breadth of our concerns, the repetitive nature of many concerns, and the proximity to the end of the road period, means that we consider that a more formal approach to assessing National Highways’ performance is now appropriate.”

The letter went on to emphasise that this investigation “is about understanding how National Highways is learning lessons and embedding them in its approach to delivering the RIS. It is not necessarily about resolving individual items”.

The agency manages England’s Strategic Road Network that takes in motorways and some major A-class highways – a total of 7,240km. The SRN is the most heavily used part of England’s roads, carrying a third of all traffic and two-thirds of all freight, according to the agency.

Upon its launch, RIS2 committed the central government to spend €32.02 billion (US$34.5 billion) on building new roads as well as road improvements to “reduce the negative impacts of the existing SRN” and “make the network safer, more reliable and more sensitive to the places through which it runs”.

The Lower Thames Crossing and the Stonehenge Tunnel are among the major projects that the agency wished to start by 2025. But due to planning hold-ups, the schemes have been moved forward to what will be RIS3, the next funding regime up to 2030.

The ORR will consider whether National Highways is meeting its performance target metrics and if it has done enough to reach them. Despite the investigation, though, ORR has said that National Highways has achieved many of its aims and delivered improved roads.

For more information on companies in this article

Related Content

  • Ukraine’s shattered highways
    July 26, 2024
    With no end to its war with Russia in sight, Ukraine is also fighting hard to cope with a growing backlog of major infrastructure projects, especially in terms of rebuilding the country’s roads and bridges. David Arminas reports.
  • Caterpillar eyes better performance in 2015 amid stormy weather
    May 13, 2015
    Caterpillar vice president Paolo Fellin sums up the past year for the global equipment manufacturer and looks at the increasing importance of telematics and machine control. David Arminas reports from Caterpillar’s Demonstration and Learning Centre in Malaga, southern Spain First the good news. Despite the difficulties, especially of the financial markets, 2014 was “a record year for a lot of things” for global heavy equipment maker Caterpillar.Now the bad news. Hang onto your seats because despite some
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Expanded and branded: RER Vélo bike project
    April 29, 2022
    Connected up cycling is becoming more important in France as the way to keep cyclists from giving up their COVID habit of pedalling to work and for pleasure. David Arminas reports.