Skip to main content

Performance probe for National Highways

A report published last July concerning England's National Highways agency noted several risk areas where problems could arise and which have now done so, according to UK media reports.
By David Arminas February 21, 2024 Read time: 2 mins
England’s Strategic Road Network that takes in motorways and some major A-class highways – a total of 7,240km (© Jonathan Mitchell/Dreamstime)

England’s National Highways agency is being investigated because “performance has dipped in a number of areas”, the independent regulator Office of Rail and Road announced.

A report published last July noted several risk areas where problems could arise and which have now done so, according to UK media reports. These surround the delivery of major schemes and management of road assets under the five-year plan RIS2 – Road Investment Strategy 2, launched in 2020.

According to UK media, the ORR sent a letter to the National Highways chief customer and strategy officer Elliot Shaw, outlining the concerns of the ORR.

“Whilst each individual item of concern is potentially manageable, the number and breadth of our concerns, the repetitive nature of many concerns, and the proximity to the end of the road period, means that we consider that a more formal approach to assessing National Highways’ performance is now appropriate.”

The letter went on to emphasise that this investigation “is about understanding how National Highways is learning lessons and embedding them in its approach to delivering the RIS. It is not necessarily about resolving individual items”.

The agency manages England’s Strategic Road Network that takes in motorways and some major A-class highways – a total of 7,240km. The SRN is the most heavily used part of England’s roads, carrying a third of all traffic and two-thirds of all freight, according to the agency.

Upon its launch, RIS2 committed the central government to spend €32.02 billion (US$34.5 billion) on building new roads as well as road improvements to “reduce the negative impacts of the existing SRN” and “make the network safer, more reliable and more sensitive to the places through which it runs”.

The Lower Thames Crossing and the Stonehenge Tunnel are among the major projects that the agency wished to start by 2025. But due to planning hold-ups, the schemes have been moved forward to what will be RIS3, the next funding regime up to 2030.

The ORR will consider whether National Highways is meeting its performance target metrics and if it has done enough to reach them. Despite the investigation, though, ORR has said that National Highways has achieved many of its aims and delivered improved roads.

For more information on companies in this article

Related Content

  • Road accident database vital for road safety
    April 12, 2012
    In the last of our profiles of laureates of the inaugural Innovation Award for Road Transport in Developing Countries (InARoaD), we meet the winner of the Road Safety category, and third prize overall A vital prerequisite for achieving safer roads is thorough assessment of prevailing traffic situations and identification of associated factors. In this respect, the availability of a comprehensive road accident database is crucial for understanding the pattern of accident causation. Conscious of the ne
  • The UK's poor road conditions
    July 24, 2024

    “The results of the National Audit Office report clearly echo those of our Annual Local Authority Road Maintenance (ALARM) survey reports across the years and confirm what we already know – the condition of our local roads is now at an all-time low and there are significant challenges ahead if we are to see significant improvements.

    “The report consistently refers to the results of our ALARM survey, highlighting its importance as a credible source of data, and the AIA welcomed the opportunity to provide information for review in this process.

  • Reality check: Topcon’s Aptix
    July 20, 2023
    The biggest challenge facing construction professionals and general contractors is disconnected data and/or siloed data sources. The recently launched Aptix integration platform has broken down these silos, explains Topcon’s Scott Langbein.
  • Getting to the heart of road noise - to eliminate disturbance
    May 20, 2016
    Traffic noise is a widespread nuisance that can impact where and how we choose to live, property prices and our quality of life. Better planning and use of mitigation factors can make a significant difference Traffic is one of the top five sources of nuisance noise – along with industry, construction, sport and leisure and general neighbourhood noise. Road traffic is also one of the most diverse sources of noise. You know where it’s going to come from, but less often what the noise will be as the volu