Skip to main content

Pedestrian bridges go-ahead for US-Canada Gordie Howe project

The Windsor-Detroit Bridge Authority has selected the design for the five pedestrian bridges which will be part of the US$4.4 billion Gordie Howe International Bridge.
By David Arminas January 24, 2020 Read time: 2 mins
Michigan Interchange pedestrian bridges over the I-75, as part of the Gordie Howe International Bridge project between the US and Canada (photo courtesy of WDBA)

The curved steel arch precast concrete bridges will be constructed as part of the Michigan Interchange at the end of the US side of the bridge rising over the Detroit River and connecting Windsor in Canada and Detroit in the US.

The pedestrian bridges over Interstate 75 will include lighting features and be compliant with Americans with Disabilities Act. They will be around 10m above the roadway and have a 3m-wide wide walkway.

Bridging North America, the private-sector partner to design, build, finance, operate and maintain the Gordie Howe project, will construct the pedestrian bridges between 2020 and 2024.

The pedestrian bridge announcement comes just after media reported construction will begin this summer on the bridge’s two A-frame towers that will suspend road deck. The bridge will have the longest main span in North America at 853m.

The Gordie Howe International Bridge project – costing $5.7 billion - is expected to be open by the end of 2024.

Windsor-Detroit Bridge Authority (WDBA) is a not-for-profit Canadian corporation created to deliver the Gordie Howe Bridge through a public-private partnership. WDBA is responsible for overseeing and managing the construction and operation of the new crossing.

The Michigan Department of Transportation is working with WDBA on the US components of the Gordie Howe International Bridge project. The 2.5km-long six-lane bridge will have a cycle and pedestrian path.

Design work is by Moriyama & Teshima, a member of the Bridging North America consortium. Other firms include ACS Infrastructure Canada, Dragados Canada, Fluor Canada, AECOM and Smith-Miller+Hawkinson Architects.

Related Content

  • New New York-Newark, New Jersey bridge connection
    November 25, 2013
    US Transportation Secretary Anthony Foxx has revealed that a Transportation Infrastructure Finance Innovation Act (TIFIA) loan worth US$474 million will help pay for construction of the replacement for the current Goethals Bridge that connects Elizabeth, New Jersey with Staten Island, New York. The Port Authority of New York and New Jersey (PANYNJ), which operates the bridge, estimates that more than $33 billion in regional goods passes across the bridge each year. An average of 74,000 vehicles/day cross t
  • Philadelphia’s iconic bridge being upgraded
    April 16, 2020
    Philadelphia’s iconic Benjamin Franklin Bridge is being upgraded.
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Vinci boosts stake in Confederation Bridge
    April 15, 2022
    Vinci Highways agreement to buy OMERS Infrastructure's shares in Strait Crossing Development (SCDI) will boost the French group’s stake in SCDI, the Canadian bridge's concession holder.