Skip to main content

Pedestrian bridges go-ahead for US-Canada Gordie Howe project

The Windsor-Detroit Bridge Authority has selected the design for the five pedestrian bridges which will be part of the US$4.4 billion Gordie Howe International Bridge.
By David Arminas January 24, 2020 Read time: 2 mins
Michigan Interchange pedestrian bridges over the I-75, as part of the Gordie Howe International Bridge project between the US and Canada (photo courtesy of WDBA)

The curved steel arch precast concrete bridges will be constructed as part of the Michigan Interchange at the end of the US side of the bridge rising over the Detroit River and connecting Windsor in Canada and Detroit in the US.

The pedestrian bridges over Interstate 75 will include lighting features and be compliant with Americans with Disabilities Act. They will be around 10m above the roadway and have a 3m-wide wide walkway.

Bridging North America, the private-sector partner to design, build, finance, operate and maintain the Gordie Howe project, will construct the pedestrian bridges between 2020 and 2024.

The pedestrian bridge announcement comes just after media reported construction will begin this summer on the bridge’s two A-frame towers that will suspend road deck. The bridge will have the longest main span in North America at 853m.

The Gordie Howe International Bridge project – costing $5.7 billion - is expected to be open by the end of 2024.

Windsor-Detroit Bridge Authority (WDBA) is a not-for-profit Canadian corporation created to deliver the Gordie Howe Bridge through a public-private partnership. WDBA is responsible for overseeing and managing the construction and operation of the new crossing.

The Michigan Department of Transportation is working with WDBA on the US components of the Gordie Howe International Bridge project. The 2.5km-long six-lane bridge will have a cycle and pedestrian path.

Design work is by Moriyama & Teshima, a member of the Bridging North America consortium. Other firms include ACS Infrastructure Canada, Dragados Canada, Fluor Canada, AECOM and Smith-Miller+Hawkinson Architects.

Related Content

  • Doka’s Voest Bridge bypass project
    February 10, 2020
    The Voest Bridge over the Danube River is part of the A7 Mühlkreis Autobahn through Linz, Austria, is 40 years. Two bypass bridges are being constructed alongside the existing cable-stayed bridge as part of the client ASFINAG’s strategy to boost traffic capacity - around 100,000 vehicles cross the old bridge each day.
  • Consorcio Panama Cuarto Puente wins fourth Panama bridge contract
    August 1, 2018
    Panama has decided to award a contract for the design and construction of a fourth bridge over the Panama Canal to Consorcio Panama Cuarto Puente. China Communications Construction Company and its subsidiary China Harbour Engineering Company are heading up the consortium for the US$1.42 billion project. Other consortia that put in bids included Dragados Sucursal Panamá and Astaldi-Daelim. News agencies report that the government initially chose the Chinese consortium in June but the final award was
  • US city of Vancouver approves new I-5 bridge
    July 18, 2022
    Vancouver in the US state of Washington and Portland in the state of Oregon are aiming for a new road bridge with the possibility of accommodating light rail transport.
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord