Skip to main content

Pedestrian bridges go-ahead for US-Canada Gordie Howe project

The Windsor-Detroit Bridge Authority has selected the design for the five pedestrian bridges which will be part of the US$4.4 billion Gordie Howe International Bridge.
By David Arminas January 24, 2020 Read time: 2 mins
Michigan Interchange pedestrian bridges over the I-75, as part of the Gordie Howe International Bridge project between the US and Canada (photo courtesy of WDBA)

The curved steel arch precast concrete bridges will be constructed as part of the Michigan Interchange at the end of the US side of the bridge rising over the Detroit River and connecting Windsor in Canada and Detroit in the US.

The pedestrian bridges over Interstate 75 will include lighting features and be compliant with Americans with Disabilities Act. They will be around 10m above the roadway and have a 3m-wide wide walkway.

Bridging North America, the private-sector partner to design, build, finance, operate and maintain the Gordie Howe project, will construct the pedestrian bridges between 2020 and 2024.

The pedestrian bridge announcement comes just after media reported construction will begin this summer on the bridge’s two A-frame towers that will suspend road deck. The bridge will have the longest main span in North America at 853m.

The Gordie Howe International Bridge project – costing $5.7 billion - is expected to be open by the end of 2024.

Windsor-Detroit Bridge Authority (WDBA) is a not-for-profit Canadian corporation created to deliver the Gordie Howe Bridge through a public-private partnership. WDBA is responsible for overseeing and managing the construction and operation of the new crossing.

The Michigan Department of Transportation is working with WDBA on the US components of the Gordie Howe International Bridge project. The 2.5km-long six-lane bridge will have a cycle and pedestrian path.

Design work is by Moriyama & Teshima, a member of the Bridging North America consortium. Other firms include ACS Infrastructure Canada, Dragados Canada, Fluor Canada, AECOM and Smith-Miller+Hawkinson Architects.

Related Content

  • Louisiana bridge contract awarded to joint venture
    August 2, 2023
    A key Louisiana bridge contract has been awarded to a joint venture.
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • AEC’s Model 6048 Bridge Deck Finisher in demand in Canada
    June 24, 2013
    Allen Engineering Corporation (AEC) recently delivered a Model 6048 Bridge Deck Finisher to PCR Contractors to be used on the 11km-long Rt. Hon. Herb Gray Parkway project in Canada. The US$1.4 billion highway infrastructure project is under construction in the Ontario municipalities of Windsor, LaSalle and Tecumseh. The Rt. Hon. Herb Gray Parkway will carry car and truck traffic from Hwy 401 in Canada to a new crossing across the Detroit River to I-75 in Michigan. The works will improve traffic flow at Cana
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.