Skip to main content

Pedestrian bridges go-ahead for US-Canada Gordie Howe project

The Windsor-Detroit Bridge Authority has selected the design for the five pedestrian bridges which will be part of the US$4.4 billion Gordie Howe International Bridge.
By David Arminas January 24, 2020 Read time: 2 mins
Michigan Interchange pedestrian bridges over the I-75, as part of the Gordie Howe International Bridge project between the US and Canada (photo courtesy of WDBA)

The curved steel arch precast concrete bridges will be constructed as part of the Michigan Interchange at the end of the US side of the bridge rising over the Detroit River and connecting Windsor in Canada and Detroit in the US.

The pedestrian bridges over Interstate 75 will include lighting features and be compliant with Americans with Disabilities Act. They will be around 10m above the roadway and have a 3m-wide wide walkway.

Bridging North America, the private-sector partner to design, build, finance, operate and maintain the Gordie Howe project, will construct the pedestrian bridges between 2020 and 2024.

The pedestrian bridge announcement comes just after media reported construction will begin this summer on the bridge’s two A-frame towers that will suspend road deck. The bridge will have the longest main span in North America at 853m.

The Gordie Howe International Bridge project – costing $5.7 billion - is expected to be open by the end of 2024.

Windsor-Detroit Bridge Authority (WDBA) is a not-for-profit Canadian corporation created to deliver the Gordie Howe Bridge through a public-private partnership. WDBA is responsible for overseeing and managing the construction and operation of the new crossing.

The Michigan Department of Transportation is working with WDBA on the US components of the Gordie Howe International Bridge project. The 2.5km-long six-lane bridge will have a cycle and pedestrian path.

Design work is by Moriyama & Teshima, a member of the Bridging North America consortium. Other firms include ACS Infrastructure Canada, Dragados Canada, Fluor Canada, AECOM and Smith-Miller+Hawkinson Architects.

Related Content

  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • AtkinsRéalis wins Île d’Orléans Bridge work
    May 2, 2024
    VIDEO: The new US$1.96 billion replacement Île d’Orléans Bridge near Quebec city, Canada, will feature two wider lanes of traffic, shoulders, multi-use lanes for pedestrians and cyclists as well as redevelopment of a major interchange and creation of green spaces.
  • Final beam for Gerald Desmond replacement
    June 18, 2020
    The final steel beam has been installed for the replacement Port of Long Beach bridge - California’s first cable-stayed bridge for vehicles.
  • Spencer wins Menai Suspension Bridge refurb
    September 16, 2022
    The UK contract, worth nearly €1.8 million, is to repaint the entire main span underdeck of the 417m-long bridge, the second oldest operational vehicular suspension bridge in the world.