Skip to main content

PB developing I-35 corridor plan

The City of Austin, Texas, has awarded a contract to Parsons Brinckerhoff for the development of a transportation corridor plan along an 18.5km section of IH 35 in central Austin. A variety of potential highway, transit, bike and pedestrian improvements are anticipated to be generated from a process which will apply a context sensitive process involving a wide range of agency and public stakeholders.
March 21, 2012 Read time: 1 min

The City of Austin, Texas, has awarded a contract to 2693 Parsons Brinckerhoff for the development of a transportation corridor plan along an 18.5km section of IH 35 in central Austin. A variety of potential highway, transit, bike and pedestrian improvements are anticipated to be generated from a process which will apply a context sensitive process involving a wide range of agency and public stakeholders.

PB is leading a multidisciplinary team involved in collecting, evaluating, ranking and prioritising a wide range of mostly short- and medium-term transportation improvements along the corridor. In addition to overall management, the firm's specific roles include planning and evaluating alternatives, traffic and civil engineering analysis, cost estimating, public and stakeholder outreach and program development of recommended solutions. The company also leads the agency partnering process that includes coordination with concurrent transit, highway and toll road studies and projects under way in the Austin area.

For more information on companies in this article

Related Content

  • Trimble helps bring Indonesia up to speed on the latest heavy construction technology
    March 28, 2014
    Indonesian infrastructure investment is seeing major highway expansion - Simon Gould writes Over the next 12 years, Indonesia has planned some massive infrastructure investments, under a master plan aimed at bringing it up to developed country status by 2025. Its Government’s Masterplan for Acceleration and Expansion of Indonesia's Economic Development (MP3EI) envisages infrastructure spending of US$400 billion between 2011 and 2025 to help achieve this (see sidebar for more on MP3EI). With limited funds of
  • A new study is being carried out for a proposed bridge project for the UK’s Thames River
    April 4, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Successful pavement maintenance
    February 16, 2012
    This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc
  • Successful pavement maintenance
    April 12, 2012
    This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc We practice preventive maintenance in our everyday lives and possibly with agency equipment such as dump trucks and backhoes, but when it comes to maintaining our roadways, most agencies will always defer repairs until the pavements have failed, resulting in very expensive repairs. This article will provide some guidance to help an agency make the switch fr