Skip to main content

Parsons wins award for tunnel project

Parsons has won the Project of the Year award for the Caldecott Tunnel Fourth Bore project. The tunnel was selected as Project of the Year by the California Transportation Foundation’s (CTF’s) 25th Annual Transportation Awards. The US$417 million tunnel has added two additional traffic lanes on State Route 24 through Berkeley Hills. The new tunnel links the cities of Oakland and Orinda and helps reduce congestion in the Bay Area, which is noted for its heavy traffic volumes. Parsons had responsibility for p
June 5, 2014 Read time: 1 min
3220 Parsons has won the Project of the Year award for the Caldecott Tunnel Fourth Bore project. The tunnel was selected as Project of the Year by the California Transportation Foundation’s (CTF’s) 25th Annual Transportation Awards. The US$417 million tunnel has added two additional traffic lanes on State Route 24 through Berkeley Hills. The new tunnel links the cities of Oakland and Orinda and helps reduce congestion in the Bay Area, which is noted for its heavy traffic volumes. Parsons had responsibility for preliminary engineering and final design of the tunnel, as well as operations, and two associated roadways.

For more information on companies in this article

Related Content

  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    August 31, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Parsons wins US-Canada bridge contract
    October 7, 2016
    Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada.
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop