Skip to main content

Oslo Fjord Link a priority for 2024

The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.
October 20, 2023 Read time: 2 mins
The E134 Oslo Fiord Link will see major improvements to connections around the capital city Oslo (image Norwegian Public Roads Administration - Statens Vegvesen)

The Norwegian government wants to prioritise work on the E134 Oslo Fiord Link project in 2024, according to the proposed national budget.

The road and tunnel project construction of a new tunnel parallel with the existing 7.3km-long structure which connects Hurum and Frogn. It carries three lanes reaches a depth of 134m below sea level.

The project was approved in 2015. The first phase of construction of the Oslo Fjord tunnel was started in 2000 and included the construction of the E134 from BjÃ3rnstad in the municipality of RÃ3yken to Vassum in the municipality of Frogn. The Oslo Fjord tunnel between MÃ3na and Verpen, the Frogntunnel and the tunnel are part of the E134 and the Oslo Fjord connection.

Works will include widening of the road from two to four lanes between the tunnel opening at MÃ3na leading 6km to the E6 at Vassum and includes expansion work on the short BrÃ3tan bridge.

Jon-Ivar Nygård, minister of transport, said the project has been ranked number one by the Norwegian Public Roads Administration - Statens Vegvesen. It is part of an outer ring road in Oslo, connecting highways E6 and E18 south of the city.

Meanwhile, the government has set aside funds in the national budget for 2024 to continue preparatory work for the new road and railway between Arna and Stanghelle. Nygård said a new E16 highway and a new Voss rail line on the section are important to improve both accessibility and traffic safety on the main thoroughfare east of Bergen.

The latest cost assessment was for around €2.57 billion. Further progress on the joint project will be considered by the government in a new National Transport Plan to be presented in early next year.
 

For more information on companies in this article

Related Content

  • Obrascòn Huarte Lain wins Gjønnes Tunnel
    May 28, 2024
    The 1.5km-long long tunnel will be a new county road connection between Gjønnes and E18 at Strand in Norway.
  • Norway planning E16 highway route
    December 14, 2015
    The Norwegian Government has unveiled its preferred solution for Hordaland road and railway route. This will be the so-called K5 alternative for the future E16 highway and Bergensbanen railway. The transport connections will run through the county of Hordaland in western Norway. This alternative will offer shorter distances, increased capacity and improved security. Journey time between Bergen and Voss will be reduced to 46 minutes from 72 minutes by car, and to 24 minutes from 63 minutes by train. The N
  • Shortlist set for Norway’s Sotra PPP project
    May 21, 2020
    Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
  • Norway moves toward more E39 coastal road improvements
    April 4, 2019
    Norway is working on plans to make more of the major north-south E39 coastal route a ferry-free highway, coasting €35.3 billion, according to media. In Norway, the trans-European route 39 is part national road system and is developed and maintained by the public roads administration. It runs for 1,330km along the coast from Klett just south of Trondheim to Nørresundby. Norway’s E39 is mostly a two-lane undivided road with only relatively short sections near Stavanger, Trondheim and Bergen being motorw