Skip to main content

Oslo Fjord Link a priority for 2024

The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.
October 20, 2023 Read time: 2 mins
The E134 Oslo Fiord Link will see major improvements to connections around the capital city Oslo (image Norwegian Public Roads Administration - Statens Vegvesen)

The Norwegian government wants to prioritise work on the E134 Oslo Fiord Link project in 2024, according to the proposed national budget.

The road and tunnel project construction of a new tunnel parallel with the existing 7.3km-long structure which connects Hurum and Frogn. It carries three lanes reaches a depth of 134m below sea level.

The project was approved in 2015. The first phase of construction of the Oslo Fjord tunnel was started in 2000 and included the construction of the E134 from BjÃ3rnstad in the municipality of RÃ3yken to Vassum in the municipality of Frogn. The Oslo Fjord tunnel between MÃ3na and Verpen, the Frogntunnel and the tunnel are part of the E134 and the Oslo Fjord connection.

Works will include widening of the road from two to four lanes between the tunnel opening at MÃ3na leading 6km to the E6 at Vassum and includes expansion work on the short BrÃ3tan bridge.

Jon-Ivar Nygård, minister of transport, said the project has been ranked number one by the Norwegian Public Roads Administration - Statens Vegvesen. It is part of an outer ring road in Oslo, connecting highways E6 and E18 south of the city.

Meanwhile, the government has set aside funds in the national budget for 2024 to continue preparatory work for the new road and railway between Arna and Stanghelle. Nygård said a new E16 highway and a new Voss rail line on the section are important to improve both accessibility and traffic safety on the main thoroughfare east of Bergen.

The latest cost assessment was for around €2.57 billion. Further progress on the joint project will be considered by the government in a new National Transport Plan to be presented in early next year.
 

For more information on companies in this article

Related Content

  • Zaxis-5s biggest-ever project
    January 27, 2014
    Norwegian contractor Carl C Fon has secured its largest-ever road construction contract to complete a 4.6km section of the E18 in the Mysen region of its home country. It started the €25million project in August 2012 and it is scheduled for completion in the summer of 2014.
  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
  • Doubts over a Helsingør-Helsingborg link
    April 14, 2021
    Danish minister questions feasibility of a road-rail tunnel between the Danish and Swedish cities.
  • Norway’s Blakkesrud Bridge to remain closed
    November 24, 2022
    The wooden bridge, which has undergone inspection, is one of a dozen or so wooden bridges closed after the collapse of the Tretten Bridge in August.