Skip to main content

Oslo Fjord Link a priority for 2024

The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.
October 20, 2023 Read time: 2 mins
The E134 Oslo Fiord Link will see major improvements to connections around the capital city Oslo (image Norwegian Public Roads Administration - Statens Vegvesen)

The Norwegian government wants to prioritise work on the E134 Oslo Fiord Link project in 2024, according to the proposed national budget.

The road and tunnel project construction of a new tunnel parallel with the existing 7.3km-long structure which connects Hurum and Frogn. It carries three lanes reaches a depth of 134m below sea level.

The project was approved in 2015. The first phase of construction of the Oslo Fjord tunnel was started in 2000 and included the construction of the E134 from BjÃ3rnstad in the municipality of RÃ3yken to Vassum in the municipality of Frogn. The Oslo Fjord tunnel between MÃ3na and Verpen, the Frogntunnel and the tunnel are part of the E134 and the Oslo Fjord connection.

Works will include widening of the road from two to four lanes between the tunnel opening at MÃ3na leading 6km to the E6 at Vassum and includes expansion work on the short BrÃ3tan bridge.

Jon-Ivar Nygård, minister of transport, said the project has been ranked number one by the Norwegian Public Roads Administration - Statens Vegvesen. It is part of an outer ring road in Oslo, connecting highways E6 and E18 south of the city.

Meanwhile, the government has set aside funds in the national budget for 2024 to continue preparatory work for the new road and railway between Arna and Stanghelle. Nygård said a new E16 highway and a new Voss rail line on the section are important to improve both accessibility and traffic safety on the main thoroughfare east of Bergen.

The latest cost assessment was for around €2.57 billion. Further progress on the joint project will be considered by the government in a new National Transport Plan to be presented in early next year.
 

For more information on companies in this article

Related Content

  • Tunnelling conference and competition
    September 23, 2019
    The annual tunnelling conference and competition is due to take place in Miami from the 18th-20th November in Miami, Florida. The competition features eight categories and aims to identify the most important ongoing underground works and technologies that help cities change and enable habits and ways of life to evolve in order to build smart and sustainable urba
  • Norway mega-project contract for Fugro
    December 20, 2017
    The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
  • Veidekke’s €180 million Norway tunnel job
    July 3, 2024
    Veidekke has won a €180 million tunnel project in Norway.
  • Temporary bridge set for Tretten in Norway
    November 9, 2022
    The Norwegian Public Roads Administration has been installing temporary bridges after it closed 14 timber structures following the collapse of the Tretten Bridge.