Skip to main content

Ontario’s Highway 407 East Phase 2B extension opens

The 23km final extension phase of the provincially-owned tolled freeway Highway 407 East near Toronto, Canada has opened.
By David Arminas January 23, 2020 Read time: 2 mins
Open for business: Highway 407 East near Toronto, Canada (photo courtesy 407 ETR)

Highway 407 East is part of the Ontario province’s Highway 407 project, a major Toronto bypass that includes the 108km 407 ETR – Express Toll Route – that is operated by concession to a private company, itself called 407 ETR Concession.

The 407 ETR company is owned by subsidiaries of the Canada Pension Plan Investment Board (50.01%), Cintra Global, a wholly owned subsidiary of Ferrovial (43.23%) and by SNC-Lavalin (6.76%).

Highway 407 East is connected to 407 ETR and allows drivers a speedy trip north of Toronto – Canada’s largest city and financial centre. The route runs through the Toronto suburb towns and cities of Burlington, Oakville, Mississauga, Brampton, Vaughan, Markham, Pickering, Whitby and Oshawa before ending in Clarington, north of Bowmanville.

Phase 1 of 407 East opened in Oshawa in 2016. The 9.6km Phase 2A opened in January 2018. The 14km Phase 2B just opened and includes another tolled north-south link between Highways 401 and 407 known as Highway 418.  The new stretch of Highway 407 and new Highway 418 is fully owned and operated by the province of Ontario.

Last September, 407 ETR opened 14 new lane-kilometres on Highway 407 ETR between Markham Road and York-Durham Line. This marks the second year in a row that 407 ETR has opened new lanes on the highway. Since 407 ETR was given the concession, it has doubled the footprint of its section of Highway 407 - adding over 567km of roadway since 2001 at a cost of around US$1.2 billion.

The company pays all costs of operating the 407 ETR, including the full cost of policing, snow removal, enforcement by the Ministry of Transportation and repairs and maintenance to the roadway.

According to the concession operator, average daily workday trips on 407 ETR increased 75% from 237,000 in 1999 to more than 415,000 in 2018. Also, 407 ETR is fully electronic tolling - barrier free. Motorists receive only one invoice for the use of Highway 407, 412, 418 and/or 407 ETR. This includes transponder leases, monthly account charges and video toll charges.

For more information on companies in this article

Related Content

  • Solar roads such as Colas’s Wattway could be the right way
    April 26, 2016
    Peter Harrop, chairman of independent research and consultancy IDTechEx, considers arguments in favour of solar roads Nowadays a major trend is the move to off-grid clean energy created by “energy harvesting” to produce electricity where it is needed. This is more controllable and increasingly at lower cost than grid power or diesel gensets, cleaner, and often less subject to interruption. It is taking new forms as revealed in the IDTechEx Research report, “High Power Energy Harvesting 2016-2026”.
  • Solar roads such as Colas’s Wattway could be the right way
    April 26, 2016
    Peter Harrop, chairman of independent research and consultancy IDTechEx, considers arguments in favour of solar roads Nowadays a major trend is the move to off-grid clean energy created by “energy harvesting” to produce electricity where it is needed. This is more controllable and increasingly at lower cost than grid power or diesel gensets, cleaner, and often less subject to interruption. It is taking new forms as revealed in the IDTechEx Research report, “High Power Energy Harvesting 2016-2026”.
  • ACS and Ferrovial of Spain interested in U.S. road project
    October 25, 2013
    Spanish construction companies ACS and Ferrovial are both taking part in the tender of the US$1.3 billion Neon Project in the U.S. State of Nevada, through different consortia. Ferrovial is bidding for the project through its subsidiary Cintra Infraestructuras, while Ferrovial has formed a consortium with Fengate Capital Management and Star America Fund GP. The Neon Project involves the extension of a 5.95km road stretch in Las Vegas city, including a bridge and a high capacity lane. The contract is expe
  • Metropistas picks up 10-year toll road extension in Puerto Rico
    May 3, 2016
    Metropistas has been granted a 10-year extension to its PR5 and PR22 toll road concessions in Puerto Rico, up to 20161. Metropistas, a subsidiary of Spanish operator Abertis, signed the agreement with the Puerto Rico Highways and Transportation Authority. The agreement entails payment of $115 million to the Authority and a redistribution of the company's future revenue. PR22 is the 83km San Juan-Arecibo highway and PR5 is the 4km urban San Juan-Bayamon highway.