Skip to main content

Ontario’s Highway 407 East Phase 2B extension opens

The 23km final extension phase of the provincially-owned tolled freeway Highway 407 East near Toronto, Canada has opened.
By David Arminas January 23, 2020 Read time: 2 mins
Open for business: Highway 407 East near Toronto, Canada (photo courtesy 407 ETR)

Highway 407 East is part of the Ontario province’s Highway 407 project, a major Toronto bypass that includes the 108km 407 ETR – Express Toll Route – that is operated by concession to a private company, itself called 407 ETR Concession.

The 407 ETR company is owned by subsidiaries of the Canada Pension Plan Investment Board (50.01%), Cintra Global, a wholly owned subsidiary of Ferrovial (43.23%) and by SNC-Lavalin (6.76%).

Highway 407 East is connected to 407 ETR and allows drivers a speedy trip north of Toronto – Canada’s largest city and financial centre. The route runs through the Toronto suburb towns and cities of Burlington, Oakville, Mississauga, Brampton, Vaughan, Markham, Pickering, Whitby and Oshawa before ending in Clarington, north of Bowmanville.

Phase 1 of 407 East opened in Oshawa in 2016. The 9.6km Phase 2A opened in January 2018. The 14km Phase 2B just opened and includes another tolled north-south link between Highways 401 and 407 known as Highway 418.  The new stretch of Highway 407 and new Highway 418 is fully owned and operated by the province of Ontario.

Last September, 407 ETR opened 14 new lane-kilometres on Highway 407 ETR between Markham Road and York-Durham Line. This marks the second year in a row that 407 ETR has opened new lanes on the highway. Since 407 ETR was given the concession, it has doubled the footprint of its section of Highway 407 - adding over 567km of roadway since 2001 at a cost of around US$1.2 billion.

The company pays all costs of operating the 407 ETR, including the full cost of policing, snow removal, enforcement by the Ministry of Transportation and repairs and maintenance to the roadway.

According to the concession operator, average daily workday trips on 407 ETR increased 75% from 237,000 in 1999 to more than 415,000 in 2018. Also, 407 ETR is fully electronic tolling - barrier free. Motorists receive only one invoice for the use of Highway 407, 412, 418 and/or 407 ETR. This includes transponder leases, monthly account charges and video toll charges.

For more information on companies in this article

Related Content

  • 3M and 407 ETR have it taped on a major motorway near Toronto
    August 1, 2019
    Canadian motorway concessionaire 407 ETR, in partnership with 3M Canada, is testing 3M's pavement marking tapes for Advanced Driver Assistance Systems on 2.5km of lanes. The initiative is part of the 407 ETR Living Labs programme of innovation to promote safety and next-generation transportation along the 140km route that opened in 1997 and was extended last year. King's Highway 407 is a tolled 400-series highway in the province of Ontario comprising a privately leased segment and publicly owned segm
  • Ontario’s Highway 413 revisited
    June 27, 2025
    Final property acquisitions are taking place for construction of Highway 413 in the Canadian province of Ontario to start later this year.
  • 407 ETR deploys billing and payment web portal
    May 4, 2012
    EbpSource, a provider of high volume e-billing and payment solutions, worldwide has announced its involvement in helping the Canadian Tolling Company International (407 ETR) to go live with a dynamic new customer self-service portal. 407 ETR manages Toronto's 407 Highway, a 108 km barrier-free toll highway that uses video cameras and vehicle-mounted transponders to record an average of 380,000 workday trips which are then processed and billed to customers.
  • Canada: LINK 427 wins Ontario’s Highway 427 Expansion contract
    March 16, 2017
    LINK 427 has been selected for the US$457 million design, build, finance and maintain contract for the Highway 427 Expansion project in Ontario province. The LINK team consists of ACS Infrastructure Canada, Dragados Canada, Bot Infrastructure, Brennan Infrastructures, MMM Group and Thurber Engineering. The project, in the Toronto area, includes a new 6.6km extension of Highway 427 from Highway 7 to Major Mackenzie Drive and widening of 4km from Finch Avenue to Highway 7. Work includes building thre