Skip to main content

OBOS proposes e-bus tunnel in Oslo

A 2.6km-long tunnel dedicated to e-buses could speed housing development in the Norwegian capital Oslo, according to developer OBOS.
By David Arminas September 26, 2022 Read time: 2 mins
OBOS - Oslo Bolig Og Sparelag - says the tunnel would be paid for by the developers, according to a report in the Norwegian business newspaper Byggeindustrien (image courtesy Blår)

Housing company OBOS says it will consider building a tunnel for electric buses if that will speed development of an area of the capital city.

OBOS, Oslo Bolig Og Sparelag, also says it would be paid for by the developers, according to a report in the Norwegian business newspaper Byggeindustrien.

Oslo Bolig Og Sparelag constructs and manages cooperative housing units and condominiums in Norway. The company builds, maintains and renovates houses and apartments; and operates and maintains commercial properties.

In Oslo, the developer wants to create a new 10,000 home community which would be served by public transportation through a 2.6km-long tunnel. The tunnel would run from Gjersrud-Stensrud to Rosenholm station in the district of Søndre Nordstrand.

The cost of the tunnel would be just under €200 million. If it gets the political go-ahead, then the tunnel and the first homes could be ready in 10 years, said Daniel Kjørberg, chief executive of OBOS.

“We have experience from building tunnels in this area and believe that a standard road tunnel is a good and cost-effective solution with few natural interventions,” noted Kjetil Vikane, a director with AF Gruppen which did a preliminary investigation into the possibility of construction.

He said the tunnel need not a be of complicated design and likely would be a straight, asphalted tunnel in well-known ground conditions.

Related Content

  • Skanska wins E18 section near Oslo
    June 19, 2023
    Construction of 660m of the Høvik Tunnel is included in the contract, as well as a cycle path.
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • IRF World Congress: moving ahead
    October 18, 2024
    On the last day of the three-day IRF World Congress in Istanbul, attendees heard what can work best, what can be improved and what the future might hold for those pursuing sustainable goals. David Arminas reports.
  • Tunnel inspections reveal safety compliance need
    April 10, 2012
    Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports