Skip to main content

Norway moves ahead with alternative fuel use

Energy consumption on its road construction sites will increasingly consist of electricity or hydrogen up to 2027.
By David Arminas November 9, 2023 Read time: 3 mins
Norway has an innovative plan to make construction green - image courtesy of © Hyotographics | Dreamstime.com

The Norwegian Public Roads Administration has adopted an action plan to reduce direct greenhouse gas emissions by 55% by 2030 compared to the 2020 level.

The plan by the administration (Statens Vegvesen) is in line with the agency’s sustainability strategy and climate commitments under the Paris Agreement. It sets stricter fuel requirements for off-road machinery in all future projects. This will ensure energy consumption on its construction sites will increasingly consist of electricity or hydrogen up to 2027, according to a report by the Norwegian business newspaper Byggeindustrien.

The administration said a recent report by Norconsult suggests that access to alternative fuels in Norway is not a major issue for most infrastructure project. But the administration said getting the fuel and energy that last mile to where is can be easily and efficiently accessed by machinery is one of the biggest challenges when converting to non-fossil fuels.

There is also the challenge of equipment manufactures not having the necessary equipment for a particular job able to run on alternative fuels. But by the Administration giving warning that it is going down the alternative-fuel route now, manufacturers can be assured that they will have a predictable market for their prototypes. It should also give a nudge to contractors who are hesitant

Per Fjeldal, climate advisor with Statens Vegvesen, said that there already exists some “low-hanging fruit” where the use of alternative fuels can easily be implemented such as electric trucks which can be phased in relatively quickly. Medium-sized dumpers are already being built in Norway and the largest will be available via import deals and rentals.

“Our experience so far is that the development of electric construction machinery is now happening faster than we could have predicted just a few years ago,” he said. “[Challenges that] many thought were insurmountable now have a solution.”

Fjeldal said the agency has been gaining experience in alternative energy use though construction of the E39 Rogfast project where the tunneling has been done almost emission-free. The work includes construction of nearly 27km of tunnels and is intended to reduce driving time between Stavanger and Bergen. Similarly, all projects that carry out stone crushing on or near sites can make provision for electric crushers.

He acknowledged that some project and contractors may find going down this route too costly and impractical when put against the financial benefits of the work. To this end, Statens Vegvesen will design into contracts financial incentives and exemptions from more stringent rules requiring the use of alternative fuels. The real issue, he noted, is to not jeopardise the project and risk delays as the work progresses.

None of the proposed requirements will be adopted without close consultation with contractors on the costs and feasibility of going for alternative-fuel equipment.

For more information on companies in this article

Related Content

  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • Norway’s record breaking undersea road tunnel
    February 25, 2015
    The world's deepest road tunnel is currently in construction near Stavanger in Norway but is only the prelude to even larger projects - report and photographs by Adrian Greeman. Norway's convoluted coastline of fjords and high mountains is famously scenic but also a major problem for transport and connections. The country has long experience of constructing tunnels as a result. Now a series of tunnels underway, or in design, around the oil industry city of Stavanger will stretch its skills more than usual.