Skip to main content

Norsenga Bridge undergoes weathering tests

Norway’s Statens Vegvesen says the wooden truss bridge – opened only in 2017 – will be the subject of a study in conjunction with the Norwegian University of Science and Technology.
By David Arminas May 19, 2023 Read time: 2 mins
The two-lane Norsenga Bridge, nearly 95m long, was opened in 2017 and has walking and cycling paths (image © Jørn Jakobsen, Norwegian Road Administration)

Statens Vegvesen says it is studying the impact of moisture and temperature on the Norsenga Bridge, one of 14 wooden truss bridges closed last year.

The bridges are on the E16 in Kongsvinger, near Oslo, which were closed after the wooden bridge at Tretten collapsed in August 2022. According to Statens Vegvesen, humidity and temperature may be affecting the load capacity of the bridge, which was reopened last September, but only to one-way traffic.

The study on one of the most is being done in conjunction with the Norwegian University of Science and Technology (NTNU).

According to Statens Vegvesen, the Norsenga Bridge is a priority structure because it has the most traffic of all the 14 bridges that were closed immediately after the collapse of the Tretten Bridge in 2022. The 150m-long, 10m-wide Tretten Bridge - only a decade old - broke in two, collapsing into the river, stranding two vehicles and their occupants. There were no casualties or injuries in the early morning accident on August 15, but one driver was airlifted to safety.

When the bridge was reopened last September, Statens assured the public the bridge is safe for traffic. But as a cautionary measure, it reduced the load by closing one of the two lanes. The bridge was reopened only after rigorous third-party inspections, said the administration.

The two-lane Norsenga Bridge, nearly 95m long, was opened in 2017 and has walking and cycling paths. It is divided into three spans and sits on pointed concrete piles, according to Nordic Steel Group which supplied material for the trusses. Around 710m³ glulam were supplied by Moelven for the construction and truss. In total, the Norsenga bridge weighs over 400 tonnes, divided into both wood and steel.  It required 66tonnes of black steel and 70tonnes of Duplex in the delivery. Five of the transverse carriers are in black steel and four in the Duplex - these weigh between 6tonnes and 10tonnes each.

The massive glulam structures are interconnected with slit plates at the ends of the glulam beams. Slit fittings enable massive wood screws to keep the construction in place. Large bridge carriers in acid-resistant steel secure the structures.

For more information on companies in this article

Related Content

  • Frost-heave a problem on Norwegian roads
    May 8, 2012
    Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but
  • Road improvements slow in Norway
    June 19, 2023
    The report from the Riksrevisjonen also noted that maintenance of the country's roads has increased significantly in the past few years.
  • The cost of crashes in the US
    May 25, 2023
    The financial cost of road crashes in the US places a heavy burden
  • Golden Gate Bridge gets Lindsay Transportation Solutions barrier
    March 10, 2015
    The iconic Golden Gate Bridge in California is now benefiting from the introduction of a new moveable barrier. Supplied by US specialist Lindsay Transportation Solutions, formerly Barrier Systems, and a division of Lindsay Corporation, this purpose-built moveable central divider will help maximise capacity while simultaneously boosting safety on the landmark structure. Constructed in the 1930s and first opened to traffic in 1937, the Golden Gate has coped extremely well with the years. Soundly engineered,