Skip to main content

New safer road workzone practices

In the UK, the construction business Connect Plus Services is implementing new practices that reduce the need for crossings of live carriageways. These practices are expected to save the lives of road construction workers. Connect Plus Services is the company that has the contract to maintain, operate and upgrade the M25 motorway around London over a 30-year period. The contract is carried out on behalf of the Highways Agency. The firm has developed a new method of managing traffic approaching road construc
September 15, 2014 Read time: 2 mins
In the UK, the construction business Connect Plus Services is implementing new practices that reduce the need for crossings of live carriageways. These practices are expected to save the lives of road construction workers. Connect Plus Services is the company that has the contract to maintain, operate and upgrade the M25 motorway around London over a 30-year period. The contract is carried out on behalf of the 2309 Highways Agency. The firm has developed a new method of managing traffic approaching road construction zones, with the aim of saving the lives of site personnel. The method, which has now been approved for use on the English motorway network, will prevent millions of crossings being made by site personnel across busy live carriageways in front of traffic travelling at fast speeds.

Road maintenance is one of the riskiest employment sectors to work. Trials carried out by Connect Plus Services, with the support of RoWSaF (an industry body which develops ways to improve the health, safety and welfare of our road workers), the Highways Agency and the Transport Research Laboratory (777 TRL), have shown that improved overhead electronic signage and nearside signage removes the need for temporary central reservation signage as a way of encouraging motorists to slow down on the approach to roadworks. The method was piloted and implemented on over 1,000km of the network over a two-year period by Connect Plus Services, (a joint venture partnership between 1146 Balfour Beatty, 3005 Atkins and 2643 Egis Roads SA), with support from 1530 Balfour Beatty Mott MacDonald, and has already saved over a million crossings by personnel.

The removal of the need to place central carriageway signage across live carriageways applies to carriageways of over three lanes and will be a major contributor to the Highways Agency’s target of eliminating all live carriageway crossings by roadworkers by December 2014.

For more information on companies in this article

Related Content

  • Contract to improve UK port connectivity
    April 8, 2014
    The Mott MacDonald Grontmij joint venture (MMG JV) is now working on the contract for the technical assurance role for the A160/A180 link to the Port of Immingham. The road project is located near Grimsby in the UK and is being developed by the Highways Agency as part of the national strategic road network improvement strategy. This is one of four schemes chosen for progression under the accelerated delivery programme and aims to reduce traffic congestion, cut journey times and increase safety. Works includ
  • Esri and Heliguy to cooperate
    February 15, 2021
    Esri UK has signed a partnership with drone developer Heliguy as part of its strategy to offer all elements of a drone service.
  • Hats off to Polypipe
    May 15, 2020
    Ridgidrain allows pipe sections to be cut without affecting pipe integrity.
  • 3D Repo develop virtual reality safety app for Balfour Beatty
    April 18, 2017
    3D Repo is working with contractors Balfour Beatty and Vinci and the UK roads agency Highways England to deploy a virtual reality simulation program for safety training. 3D Repo, a spin-off from University College London, develops open-source software for building information modelling in the cloud. More than 40 different 3D file formats are decomposed and federated in the company’s big data repository.