Skip to main content

New safer road workzone practices

In the UK, the construction business Connect Plus Services is implementing new practices that reduce the need for crossings of live carriageways. These practices are expected to save the lives of road construction workers. Connect Plus Services is the company that has the contract to maintain, operate and upgrade the M25 motorway around London over a 30-year period. The contract is carried out on behalf of the Highways Agency. The firm has developed a new method of managing traffic approaching road construc
September 15, 2014 Read time: 2 mins
In the UK, the construction business Connect Plus Services is implementing new practices that reduce the need for crossings of live carriageways. These practices are expected to save the lives of road construction workers. Connect Plus Services is the company that has the contract to maintain, operate and upgrade the M25 motorway around London over a 30-year period. The contract is carried out on behalf of the 2309 Highways Agency. The firm has developed a new method of managing traffic approaching road construction zones, with the aim of saving the lives of site personnel. The method, which has now been approved for use on the English motorway network, will prevent millions of crossings being made by site personnel across busy live carriageways in front of traffic travelling at fast speeds.

Road maintenance is one of the riskiest employment sectors to work. Trials carried out by Connect Plus Services, with the support of RoWSaF (an industry body which develops ways to improve the health, safety and welfare of our road workers), the Highways Agency and the Transport Research Laboratory (777 TRL), have shown that improved overhead electronic signage and nearside signage removes the need for temporary central reservation signage as a way of encouraging motorists to slow down on the approach to roadworks. The method was piloted and implemented on over 1,000km of the network over a two-year period by Connect Plus Services, (a joint venture partnership between 1146 Balfour Beatty, 3005 Atkins and 2643 Egis Roads SA), with support from 1530 Balfour Beatty Mott MacDonald, and has already saved over a million crossings by personnel.

The removal of the need to place central carriageway signage across live carriageways applies to carriageways of over three lanes and will be a major contributor to the Highways Agency’s target of eliminating all live carriageway crossings by roadworkers by December 2014.

For more information on companies in this article

Related Content

  • Advanced grooving method for UK motorway
    June 10, 2015
    Balfour Beatty Mott MacDonald has used Klaruw’s advanced longitudinal grooving system, GrooveTex, to retexture sections of concrete surface on the M20 motorway in the county of Kent, UK. The GrooveTex system improves and restores surface skid resistance by creating micro longitudinal grooves using closely spaced diamond tipped saw blades at a predetermined width and depth. GrooveTex is based on the diamond grinding principle. GrooveTex adjusts to and follows the profile of the surface. The surface lev
  • UK Highways Agency unveils additional spending plans
    April 12, 2013
    In the UKL the Highways Agency has announced plans for an additional 58 schemes intended to boost the economy, reduce congestion and improve safety. These schemes form part of the third, and final, stage of the Highways Agency’s pinch point programme. The 58 schemes represent an investment of €114.6 million (£98 million) and are intended to remove bottlenecks and keep traffic moving on England’s motorways and major A roads. They will be delivered by March 2015 and will bring an estimated €1.64 billion (£1.4
  • Stimsonite Click Stud saves on in-situ replacement time
    April 29, 2015
    Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional
  • Final Lower Thames Crossing approval awaited
    November 7, 2022
    Work in the UK includes a twin bore tunnel under the River Thames east of London.