Skip to main content

Netherlands traffic congestion increasing

The Netherlands is seeing a massive increase in traffic congestion on its road network. Traffic volumes for the first six months of 2018 were 20% higher than for the same period in the previous year. The data was collated by the Netherlands-based transport body ANWB. This also reveals that the most severe congestion problems occurred on the A4 highway between Amsterdam and Rotterdam, the A20 highway between the Hoek van Holland and Gouda and the A27 highway between Utrecht and Breda.
July 5, 2018 Read time: 1 min

The Netherlands is seeing a massive increase in traffic congestion on its road network. Traffic volumes for the first six months of 2018 were 20% higher than for the same period in the previous year. The data was collated by the Netherlands-based transport body 5181 ANWB. This also reveals that the most severe congestion problems occurred on the A4 highway between Amsterdam and Rotterdam, the A20 highway between the Hoek van Holland and Gouda and the A27 highway between Utrecht and Breda.

For more information on companies in this article

Related Content

  • Study highlights weather effects on traffic
    July 9, 2012
    Extreme weather conditions cost the EU’s transport system at least €15 billion/year. This is the result of a study carried out by the Finnish VTT Technical Research Centre. The study reveals that the greatest costs incurred are from road accidents, with the associated material and psychological effects. Costs arising from accidents are expected to decrease in volume, although time-related costs attributable to delays are projected to increase. In part, this last effect is due to climate change, which has an
  • Road safety improves in HCMC
    August 15, 2023
    Road safety is improving in HCMC.
  • UK announces details of major road building programme
    December 1, 2014
    Details of a major programme of road building projects have been unveiled by the UK Government. The plan envisages some €18.83 billion (£15 billion) being spent on constructing new road links and upgrading existing routes. This is the largest single programme of works for the UK’s road network for several decades. The plan includes 100 major projects, perhaps the most notable being the long-awaited tunnel for the A303 past the Stonehenge archeological site. The existing route is narrow at this point and suf
  • Sales down but Deutz keeps profit level in first half 2015
    August 11, 2015
    German engine maker Deutz has reported new order sales were down just over 10% in the first half of this year, to €670.7 million. Unit sales also fell, around 21% down on the first half of last year, to 78,120 engines. Sales of 41,213 engines in the second quarter of 2015 were 11.7% higher than in the previous quarter but were 24.5% lower than in prior-year quarter (Q2 2014: 54,622 engines). Revenue was in line with forecasts, falling by 11% year on year to €670.2 million compared with €753.4 million